OPW052025 Report - Part 2
Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.
Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Performance Outcomes Acceptable Outcomes Response
PO2 AO2.1
Stormwater drainage infrastructure is planned, designed and Stormwater drainage planning, design and construction is in The proposed driveway follows an existing track located
constructed to: accordance with PSP6 Engineering Design Standards - Roads, through the allotment and all existing stormwater flow
(a) incorporate allowance for increased flood risk and tidal drainage and earthworks and the latest version of the regimes will remain in place. Some further formalisation of
inundation through pipework as a result of cilmate change Queensland Urban Drainage Design Manual. drains will be undertaken in accordance with the prepared
and sea level rise; plans and supporting geotechnical reporting. All site drains
(b) ensure the development is adequately drained; and AO2.2 will discharge to grassed/vegetated paddocks and where
The stormwater drainage system connects to a lawful point of necessary rock energy dissipation will be installed.
(c) ensure stormwater is managed and lawfully discharged
discharge in accordance with PSP6 Engineering Design Performance Outcome PO2 and Acceptable Outcomes
without altering stormwater drainage characteristics
external to the site. Standards - Roads, drainage and earthworks. AO2.1, AO2.2, AO2.3 and AO2.4 can be met.
AO2.3
Stormwater flows discharging from the development are
demonstrated to be consistent with pre-development
characteristics.
AO2.4
Development provides for the management of stormwater to
incorporate appropriate allowance for climate change impacts
(including rainfall intensity and sea level rise), in accordance with
PSP6 Engineering Design Standards – Roads, Drainage and
Earthworks.
PO3 AO3.1
Stormwater drainage infrastructure conveys run-off in a manner Stormwater drainage infrastructure meets the desired standards The proposed driveway follows an existing track located
that allows roads to deliver desired standards of service of service for roads functionality set out in PSP6 Engineering through the allotment and all existing stormwater flow
appropriate to the local conditions and local stormwater drainage Design Standards - Roads, Drainage and Earthworks. regimes will remain in place.
characteristics. Performance Outcome PO3 and Acceptable Outcome AO3
can be met.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.