OPW052025 Report - Part 2

Attached to the e-mail Operational Works Application OPW25/0093 - OPW Report Part 2 _May 2025 - 146 Middle Creek Road_ Federal - Email 2 of 2.

of 107

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (17.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Performance Outcomes                                                Acceptable Outcomes                                                                              Response
PO4                                                                 AO4.1
Stormwater infrastructure is compatible with existing               The location, design and construction of stormwater drainage           The proposed driveway follows an existing track located
infrastructure, allows for easy access for the ongoing              structures is in accordance with PSP6 Engineering Design               through the allotment and all existing stormwater flow
maintenance by Council, is cost effective across its design life.   Standards - Roads, drainage and earthworks.                            regimes will remain in place. Some further formalisation of
                                                                                                                                           drains will be undertaken in accordance with the prepared
                                                                    AO4.2
                                                                                                                                           plans and supporting geotechnical reporting. All site drains
                                                                    Where infrastructure is located on private land an easement is
                                                                                                                                           will discharge to grassed/vegetated paddocks and where
                                                                    dedicated over the infrastructure in accordance with PSP6
                                                                                                                                           necessary rock energy dissipation will be installed.
                                                                    Engineering Design Standards - Roads, drainage and
                                                                    earthworks.                                                            Performance Outcome PO4 and Acceptable Outcomes
                                                                                                                                           AO4.1 and AO4.5 can be met.
                                                                    AO4.3                                                                  Acceptable outcomes AO4.2, AO4.3 and AO4.4 are not
                                                                    Any alterations or repairs to infrastructure as a result of the        applicable.
                                                                    development are made at no cost to Council.

                                                                    AO4.4
                                                                    Development avoids stormwater inflow and infiltration to the
                                                                    sewer infrastructure network.

                                                                    AO4.5
                                                                    Stormwater infrastructure is designed to minimise maintenance
                                                                    costs and the requirement for specialized equipment for
                                                                    maintenance techniques.


PO5                                                                 AO5.1
Stormwater drainage infrastructure is aligned to avoid crossing     Stormwater drainage infrastructure avoids crossing waterways,          Not applicable as no new stormwater infrastructure is
waterways, wetlands, drainage lines and ecological important        wetlands drainage lines and ecologically important areas or            proposed.
areas, or where it is demonstrated this is unavoidable, disturbed   follows the edge of existing disturbed areas.
areas are reinstated and revegetated upon completion of works.
                                                                    AO5.2
                                                                    Stormwater drainage infrastructure is co-located with other
                                                                    infrastructure within a combined utility corridor where appropriate.

                                                                    AO5.3
                                                                    Temporary vehicular crossings of waterways must be designed and
                                                                    constructed to be consistent with the current International Erosion
                                                                    Control Association Best Practice Book Series.
Log in to download the original file

OPW052025 Report - Part 2.pdf · 17.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.