Performance Outcomes Acceptable Outcomes Response
PO4 AO4.1
Stormwater infrastructure is compatible with existing The location, design and construction of stormwater drainage The proposed driveway follows an existing track located
infrastructure, allows for easy access for the ongoing structures is in accordance with PSP6 Engineering Design through the allotment and all existing stormwater flow
maintenance by Council, is cost effective across its design life. Standards - Roads, drainage and earthworks. regimes will remain in place. Some further formalisation of
drains will be undertaken in accordance with the prepared
AO4.2
plans and supporting geotechnical reporting. All site drains
Where infrastructure is located on private land an easement is
will discharge to grassed/vegetated paddocks and where
dedicated over the infrastructure in accordance with PSP6
necessary rock energy dissipation will be installed.
Engineering Design Standards - Roads, drainage and
earthworks. Performance Outcome PO4 and Acceptable Outcomes
AO4.1 and AO4.5 can be met.
AO4.3 Acceptable outcomes AO4.2, AO4.3 and AO4.4 are not
Any alterations or repairs to infrastructure as a result of the applicable.
development are made at no cost to Council.
AO4.4
Development avoids stormwater inflow and infiltration to the
sewer infrastructure network.
AO4.5
Stormwater infrastructure is designed to minimise maintenance
costs and the requirement for specialized equipment for
maintenance techniques.
PO5 AO5.1
Stormwater drainage infrastructure is aligned to avoid crossing Stormwater drainage infrastructure avoids crossing waterways, Not applicable as no new stormwater infrastructure is
waterways, wetlands, drainage lines and ecological important wetlands drainage lines and ecologically important areas or proposed.
areas, or where it is demonstrated this is unavoidable, disturbed follows the edge of existing disturbed areas.
areas are reinstated and revegetated upon completion of works.
AO5.2
Stormwater drainage infrastructure is co-located with other
infrastructure within a combined utility corridor where appropriate.
AO5.3
Temporary vehicular crossings of waterways must be designed and
constructed to be consistent with the current International Erosion
Control Association Best Practice Book Series.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.