Council archive · source document
SPA Decision Notice - 010.2010.00000712.001 [As Published] · 172010.712
2010/712
Plan No. Rev. Plan Name – Prepared by Date
P.101 Perspectives – Kidd & Co No Date
WD.204 P2 Proposed First Floor – Kidd & Co 21 April 2010
WD.201 P2 Existing Ground Floor – Kidd & Co 21 April 2010
WD.203 P2 Existing First Floor – Kidd & Co 21 April 2010
WD.503 P2 Proposed Elevations – Kidd & Co 21 April 2010
WD.504 P2 Proposed Elevations – Kidd & Co 21 April 2010
Relevant Period
2. The Preliminary Approval lapses if the works have not happened by 7 June 2012, unless an
application to extend the currency is approved by Council.
Building Height
3. The building height shall not exceed 8.0 metres above the natural ground level, finished
ground level and 2 storeys.
Landscaping
4. Existing trees on the site and within road reserves shall be retained, except where required to
be removed due to building operations or the conduct of the approved use. In this regard, the
removal of vegetation shall not extend beyond 3 metres of the building footprint of the
Detached House.
5. All other vegetation shall be protected from interference resulting from clearing or construction
activities by:
5.1. Clearly marking vegetation to be retained with flagging tape;
5.2. Installing protective fencing around the drip line of the vegetation;
5.3. Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
cause interference with vegetation; and
5.4. Low impact construction techniques are used around vegetation to minimise
interference with the vegetation.
6. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:
6.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
6.2. Disposal for firewood.
6.3. Disposal for landscaping purposes.
7. The applicant is advised that burning off is an unacceptable method of disposal.
Water Storage
8. All new hot water systems installed shall be either solar; electric heat pump; or gas (LPG or
natural).
General
9. The development shall be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood due to the creation of excessive noise, lighting
nuisance, or other emissions.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SPA Decision Notice - 010.2010.00000712.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 55 KB (small file)
- File type
No other editions are linked here.