SPA Decision Notice - 010.2010.00000712.001 [As Published] · 172010.712

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                                                                         2010/712




10.    Buildings and structures (including swimming pools, sheds, tennis courts, or outbuildings) shall
       not be constructed under overhead electricity transmission lines, or within any easements.
Earthworks
11.    Earthworks required on site shall be carried out in accordance with Council’s Planning
       Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional
       ponding of water on any adjoining lands or concentrate or direct overland flow on to an
       adjoining property.
Sediment and Erosion Control
12.    Sediment and erosion control measures shall be in place prior to the building works. If such
       measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued. Such fines
       can be issued if sediments from the site are found to enter or have the potential to enter
       Council’s stormwater system or natural waterways.

5      REFERRAL AGENCY CONDITIONS
Not applicable.

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:

      Plan No.             Rev.    Plan Name – Prepared by                     Date
      P.101                        Perspectives – Kidd & Co                    No Date
      WD.204               P2      Proposed First Floor – Kidd & Co            21 April 2010
      WD.201               P2      Existing Ground Floor – Kidd & Co           21 April 2010
      WD.203               P2      Existing First Floor – Kidd & Co            21 April 2010
      WD.503               P2      Proposed Elevations – Kidd & Co             21 April 2010
      WD.504               P2      Proposed Elevations – Kidd & Co             21 April 2010

7      ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.     The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
       Local Law No. 12, prevents a builder or building contractor carrying out building work on a
       building site in a way that makes or causes audible noise to be made from the building work:
       1.1.    On a Sunday or public holiday, at any time; or
       1.2.    On a Saturday or a business day, before 7.00am or after 6.30pm.
       A maximum penalty of $1,500 applies to an offence under this legislation.
2.     Prior to the commencement of the development, a plumbing assessment must be obtained
       from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage
       Act 2002 (as applicable).
For preliminary approvals, for properties located in the catchment area for the Coastal Major Road
Network Infrastructure Charges Plan, an Infrastructure Charge to be issued in accordance with the
Infrastructure Charges Plan and Chapter 8 of the “Sustainable Planning Act 2009” may be triggered
when further development permit/s is/are issued.



                                                                                      Page 3 of 7

Used in these records

About this file

File size
55 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPA Decision Notice - 010.2010.00000712.001 [As Published].pdf · 55 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.