RFI - Attachment B - Stormwater management Report · MCU20/0026
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
50mg/L of total suspended solids (TSS) as a maximum concentration;
Turbidity (NTU) value less than 10% above background;
pH value must be in a range 6.5-8.5 except where, and to the extent that, the natural receiving
waters lie outside this range.
Defects in erosion and sediment control devices, such as sediment fences, are to be inspected and
documented. Upon Inspection, the contractor is to determine whether the device should be replaced or
repaired. Documentation is to include how the damage was caused and what measures can be
implemented to reduce the possibility of repeat occurrences. Any damage to either permanent or
temporary water quality control structures or devices is to be immediately rectified at the contractor’s
expense.
The effectiveness of the erosion and sediment control devices can be monitored by visual audits. All
ESC measures are to be inspected:
at least daily (when work is occurring on site) or weekly (when work is not occurring on site);
within 24 hours of expected rain; and
within 18 hours of a rainfall event (i.e. an event of sufficient intensity and duration to mobilise
sediment on site).
Drainage paths are to be inspected to ensure the sediment fences are not being bypassed as a result
of soil erosion.
Sediment laden runoff shall be prevented from entering neighbouring properties. This shall be achieved
by landscaping disturbed areas immediately and prior to a rainfall event.
4.2.3 M aint en an ce and M onit o ri ng R equ ir em ent s
Periodic maintenance and monitoring of stormwater devices proposed in this report is crucial to ensure
effective operation and design life.
Inspect field inlet grates, pits and underground pipes for blockage or damage at least 6 monthly or after
significant rainfall event. The filter baskets shall be inspected and maintained preferably by the
manufacturer to avoid damage to units and to ensure adequate cleaning and record keeping. For the
first 12 months routine inspections of filter baskets shall be carried out monthly with routine clean out
at alternate months. Results of the initial 12 months maintenance program shall be used to determine
future maintenance intervals. Refer manufactures maintenance and monitoring methodology for
specific details. Maintenance of ESC measures must occur in accordance with Table 10.
Table 8 - ESC maintenance requirements.
ESC Measure Maintenance Trigger Timeframe for Completion
of Maintenance
Sediment basins When settled sediment exceeds Within 7 days of the
the volume of the sediment inspection.
storage zone
Other ESC measures The capacity of ESC measures By the end of the day.
falls below 75%.
Sediment accumulation on ESC devices is to be removed and disposed of to the satisfaction of NSC.
11 June 2020 Stormwater Management Report 11
S20-023 40 Park Crescent, Sunrise Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment B - Stormwater management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.