Table 6 – SPP Appendix 2: Part 2 Construction Phase – Stormwater Management Design Objectives
for Temporary Drainage Works
Temporary Drainage Works Anticipated Operation Design Life and Minimum
Design Storm Event
<12 Months 12-24 Months >24 Months
Drainage Structure 1 in 2 year 1 in 5 year 1 in 10 year
ARI/39% AEP ARI/18% AEP ARI/10% AEP
Where located immediately up-slope of an 1 in 10 year ARI/10% AEP
occupied property that would be adversely
affected by the failure or overtopping of the
structure
Culvert Crossing 1 in 1 year ARI/63% AEP
Table 7 – SPP Appendix 2: Part 3 Construction Phase – Stormwater Management Design Objectives
for Emergency Spillways on Temporary Sediment Basins
Drainage Structure Anticipated Operation Design Life and Minimum
Design Storm Event
<3 Months 3-12 Months >12 Months
Emergency spillways on temporary 1 in 10 year 1 in 20 year 1 in 50 year
sediment basins ARI/10% AEP ARI/5% AEP ARI/2% AEP
Best practice erosion and sediment controls must be installed to minimise the discharge of sediment
laden runoff during construction and to achieve the objectives outlined in Tables 7-9. This is discussed
in the following section.
4.2.2 E ro sio n and Se di men t Co n tr ol
The proposed development received an erosion hazard score of 19. Refer to Appendix A for details.
Erosion and sediment control plans shall be developed during the detailed design phase in accordance
with the requirements outlined in the International Erosion Control Association (IECA) 2008 best
practice documentation. Erosion and sediment control plans are based on three sets of control
measures:
drainage control;
erosion control; and
Sediment control.
These control measures must be continually maintained in an effective operational condition and
amended as required to minimise environmental harm. Sediment disposal from site is to occur to the
satisfaction of NSC and the following release limits of stormwater captured in a sediment basin shall be
adhered to:
11 June 2020 Stormwater Management Report 10
S20-023 40 Park Crescent, Sunrise Beach
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment B - Stormwater management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.