Council archive · source document
RFI - Attachment B - Stormwater management Report · MCU20/0026
Original PDF page 27, section 8. The text section number identifies this passage in the reader.
30.51
.1
27
See datum note
POWER POLE E
5
Concrete
.2
G
27
FIRE HYDRANT
A
6
.6
R
26
4
6
.1
.1
27
27
STOP VALVE
Roof A
G
CR 9
SEWER MANHOLE
.9
Level
26
5
.6
26
ROOFWATER PIT 29.84
T*S1/100 Roof
Garage
.00
POWER BOX Level
30.53 Level
ES 9
TELSTRA PIT
.8
26.64
5
26
27
.0
27
RETAINING WALL
9
.9
26
STORMWATER MANHOLE
CE
GAS SUPPLY/GAS CYLINDER
TEMPORARY BENCH MARK (TBM)
PERMANENT SURVEY MARK
GULLY GRATE
N
T
WATER METER
SIGN
HEADWALL/CROSSOVER Water Line
ROCK WALL Approximate only
Plotted from
PALM Council Records
Sewer Manhole
TREE SL 26.74
(unable to open)
! Green contour lines denote "ground level" as
defined by local council.
! Subject lot boundary dimensions and area are
derived from field survey.
!
Levels shown on this plan are correct in relation to
the benchmarks placed on this plan.
AJS Surveys accepts no responsibility for any
subsequent plans or works that do not use the same
level datum as shown on this plan.
Subject title has not been obtained, therefore AJS
2
.2
27
Surveys can not certify that no easements affect this
lot. A full title search should be carried out prior to
any construction.
!
This plan has been prepared for the purpose of
designing new constructions and should not be used
for any other purpose.
Certificate of Title for this site has not been obtained.
Unless noted otherwise only visible services have been
located.
Natural ground contours are at 0.5 metre intervals. REVISIONS ASSOCIATED CONSULTANTS: SURVEYOR DCD DATE 30/01/2019 LEVEL DATUM: CLIENT: SITE: 40 Park Crescent, Sunshine Beach SCALE 1:100 (A0)
Prior to any demolition, excavation or construction on C
AHD
the site, the relevant authorities should be contacted
for accurate location of all services.
B SHAUN LOCKYER ARCHITECTS DRAWN PDR CHECKED DCD DERIVED FROM PSM 107884 ASHA BISWAS Lot 599 on RP 48112 PLAN REF: V0420-D1
A (RL 1.474m)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment B - Stormwater management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.