Council archive · source document
RFI - Attachment B - Stormwater management Report · MCU20/0026
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
12m above ngl 12m above ngl
existing ngl
existing ngl
12m above ngl 12m above ngl
existing ngl
existing ngl
note:
proposed design complied with the 12m
height limit as defined in the code
DRAWN REV DATE ISSUE PROJECT CLIENT DRAWING NAME PHASE DWG NO REV
PROJECT NO 0309
DL
DL
B
C
24.04.20
11.05.20
SD Issue
Prelim Council RFI
40 Park Crescent, Asha & Sandeep 3D axo SD 050.00 E SCALE
Sunshine Beach Biswas
A3
DL D 13.05.20 Council RFI massing study
DL E 08.06.20 Revised Council Submission schematic design
1:1 @
Do not scale from drawings. Dimensions are to be checked on site prior to commencement of work. Discrepancies to be brought to the attention of the author. Any dimensions not nominated must be referred to the Architect for confirmation. The concepts and information contained in this document are the copyright of Architect. Use or copying of the document in whole or in part without the written permission of the Architect constitutes an infringement of copyright.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment B - Stormwater management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.