Delegated Report - Code - Planning OPW25 0040 · OPW25/0040
2. The Currency Period for this development approval lapses if the development has not
substantially started by 7 July 2027, unless an application to extend the currency period is
approved by Council.
GENERAL CONDITIONS
Engineering
3. A condition report including photographs of the frontage of the site must be completed and
submitted to Council prior to the prestart meeting.
4. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.
5. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works.
6. A Construction Management Plan must be submitted to Council prior to the prestart meeting
and must specifically address the following:
a. traffic Management during the construction phase;
b. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD);
c. provision for safe pedestrian access across the frontage of the site both during and
outside working hours.
Performance Bond
7. Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
submitted to Council, to secure the performance of all the conditions of this approval, prior
to the commencement of the works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of the approval less any costs incurred by Council
in respect of enforcing performance of this permit. Council reserves the right to call upon the
bond or guaranteed sum to effect compliance with conditions.
DURING CONSTRUCTION
Engineering
8. The integrity and condition of any existing public or Council infrastructure and services
(above ground and/or underground) must not be adversely affected by the proposed works
9. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
10. All works must be constructed and work procedure undertaken in accordance with:
a. the approved plans/documents and conditions detailed in this Decision Notice;
b. all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines;
Page 6 of 9
Document Set ID: 23666625
Version: 4, Version Date: 07/07/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW25 0040.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.