Delegated Report - Code - Planning OPW25 0040 · OPW25/0040

of 9

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                      c.      the latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                     Works within Road Reserves
               11.    No removal of street trees is permitted without Council’s prior written approval.
               12.    Safe pedestrian and vehicle access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               13.    All works must match neatly with existing road and verge/footpath features. Additional works
                      beyond the frontage may be required to provide an acceptable transition to existing road and
                      verge/footpath profiles.
                     Driveways
               14.    The driveway crossover must be constructed generally in accordance Council’s Standard
                      Drawings RS-049 and RS-050 and any associated addendum.
               15.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf and must be maintained by the developer until established.
               16.    The following must be complied with during the construction of the required
                      crossovers/driveways:
                      a.      the driveways surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete;
                      b.      the driveways must be in accordance with the requirements of AS2890.1 Off-Street
                              Car Parking for longitudinal and crossfall gradients;
                      c.      the driveway must be constructed so as to not concentrate or direct stormwater runoff
                              onto neighbouring properties;
                      d.      have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset,
                              unless a written approval is obtained from Unitywater/Energex/Telstra and submitted
                              to Council;
                      e.      any stormwater kerb outlet in close proximity to the edge of the new driveway must be
                              provided with an approved kerb adaptor;
                      f.      any existing kerb sections requiring removal due to the works must be saw-cut and
                              removed to allow for a smooth and neat finish with the new driveway.
               17.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveway and car park areas will remain the
                      responsibility of the property owner/developer.
                      Stormwater Drainage
               18.    The constructed driveway must not cause additional ponding on the road formation or the
                      road reserve.
               19.    Any proposed surface drainage grate must be located wholly within private property.
                      Environment (Erosion and Sediment Control)
               20.    Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must
                      not be released from the site or to waters within the site, or be likely to be released should
                      rainfall occur, unless all reasonable and practicable measures are taken to prevent or
                      minimise the release and concentration of contamination.


                                                                                                          Page 7 of 9

Document Set ID: 23666625
Version: 4, Version Date: 07/07/2025

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW25 0040.pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.