Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

5179Response2

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

 

PRINCIPAL 12 Maple Street (PO Box 639) Cooroy Q 4563 ABN 59 847 644 252
Max L. Watterson PH 07 5442 6121
Cadastral Surveyor (Qld) FAX 07 5442 5125

 

= | MAX WATTERSON+ASSOCIATES

CONSULTING SURVEYORS & PLANNERS

8'" February 2021
Ref: 20/5179
Your Ref: RAL20/0021

The Chief Executive Officer
Noosa Shire Council

PO Box 141

TEWANTIN QLD 4565

Attention: Glen Conforti
Dear Sir,

Re: Development Application for Reconfiguration of a Lot — 1 Lot into 18 Lots
Lot 3 on RP113733

2 Pearsons Road, Cooroy
Applicant: Vantralia Pty Ltd

| refer to the above-mentioned matter and your letter of Further Advice dated 18"
December 2020 and | respectfully supply the following information:

Issue 1 Infrastructure in Riparian Buffer

The proposed stormwater treatment system of the development includes the
Bioretention Basin located within the Park, three bio pods in the road reserve and
three tree pits in the road reserve.

The proposed Bioretention Basin has been re-located to minimize impact upon the
mapped riparian buffer area and MSES Category R vegetation. Please find an
amended Master Plan of the development prepared by Callaghan & Toth showing
the new location of the water quality device, the outlet and footpath.

The new location of the Bioretention Basin is adjacent and 2 metres off the north-
eastern boundary of Lot 17.

Issue 2 Bioretention Outlet

The aforesaid Master Plan also shows details of the piping of the outlet of the lowflow
from the basin. The piping is proposed to end short of the creek within the riparian
buffer area and in a low existing swale along the northern boundary.

Issue 3 Maintenance of the eco aid system

The eco aid underground detention system has been replaced by the above-
described detention basin and the inclusion of an enlarged stormwater pipe to
increase detention.

B.Surv(UNSW). M.S.S.S.1 EMAIL [email protected]
Log in to download the original file

5179Response2.pdf · 420 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.