Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

5179Response2

of 2

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Please also find attached an amended Integrated Water Management Plan -
Revision 2 prepared by Callaghan & Toth, which provides details of the proposed
stormwater system and an assessment of the attenuation of the increase in pollutant
loads.

Issue 4 Flood

Please find attached an amended Flood Assessment Report — Revision 2 prepared
Callaghan & Toth, which has been updated to reflect the altered detention basin and
provides clarification that the one-year ARI ids limited to the pre-development peak.
Issue 5 Fill to Lots 15, 16 & 17

The levels of filling along the rear of Lots 15, 16 and 17 has been reduced to 0.5m as
shown the Master Plan prepared by Callaghan & Toth.

Please note that this submission completes our response to your Information
Request.

| thank you for your consideration in this matter.

Yours faithfully
MN

Max Watterson
Log in to download the original file

5179Response2.pdf · 420 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.