Original source · versioned page text
5179Response2
Please also find attached an amended Integrated Water Management Plan - Revision 2 prepared by Callaghan & Toth, which provides details of the proposed stormwater system and an assessment of the attenuation of the increase in pollutant loads. Issue 4 Flood Please find attached an amended Flood Assessment Report — Revision 2 prepared Callaghan & Toth, which has been updated to reflect the altered detention basin and provides clarification that the one-year ARI ids limited to the pre-development peak. Issue 5 Fill to Lots 15, 16 & 17 The levels of filling along the rear of Lots 15, 16 and 17 has been reduced to 0.5m as shown the Master Plan prepared by Callaghan & Toth. Please note that this submission completes our response to your Information Request. | thank you for your consideration in this matter. Yours faithfully MN Max Watterson
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.