           10.   Is there open Excavation? NO

                 What’s Depth of excavation?
                 Width Excavation?
                 Length Excavation?
                 Is barrier System required?
                 Barrier System selected?
                 Are Steel Plates being used?

                 Table E1 – Protection / delineation adjacent to excavations

                     Speed of            Traffic        Clearance to                       Depth of excavation, mm
                   traffic¹ km/h      volume² vpd       excavation³
                                                             m                50 to 250        260 to 500            > 500

                        < 70                All                < 2.5          Standard            Close             Safety
                                                                             delineation       delineation          barrier

                                                             2.5 to 5.0       Standard          Standard            Close
                                                                             delineation       delineation       delineation

                                                               > 5.0            None             None                None

                        ≥ 70              ≤1500                ≤ 5.0          Standard            Close             Safety
                                                                             delineation       delineation          barrier

                                                               > 5.0            None             None                None

                                         > 1500                ≤ 6.0          Standard            Close             Safety
                                                                             delineation       delineation          barrier

                                                               > 6.0            None             None                None

      NOTES:
           1. Posted speed limit during roadworks.
           2. For multilane roads, one way volume. For 2-lane, 2-way roads, sum of both directions.
           3. Clearance to nearest edge of traffic lane or nominal edge if the edge is not marked.




Issued:                                    Traffic Guidance Scheme & Scope of Works                  Uncontrolled when printed
Revised:         Version 1         Author: Shaylene Rubach          Approved by: Wayne Grice                 Page 3 of 9

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.