Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239
Plans and drawings: the text below has words only, no drawings.
10. Is there open Excavation? NO
What’s Depth of excavation?
Width Excavation?
Length Excavation?
Is barrier System required?
Barrier System selected?
Are Steel Plates being used?
Table E1 – Protection / delineation adjacent to excavations
Speed of Traffic Clearance to Depth of excavation, mm
traffic¹ km/h volume² vpd excavation³
m 50 to 250 260 to 500 > 500
< 70 All < 2.5 Standard Close Safety
delineation delineation barrier
2.5 to 5.0 Standard Standard Close
delineation delineation delineation
> 5.0 None None None
≥ 70 ≤1500 ≤ 5.0 Standard Close Safety
delineation delineation barrier
> 5.0 None None None
> 1500 ≤ 6.0 Standard Close Safety
delineation delineation barrier
> 6.0 None None None
NOTES:
1. Posted speed limit during roadworks.
2. For multilane roads, one way volume. For 2-lane, 2-way roads, sum of both directions.
3. Clearance to nearest edge of traffic lane or nominal edge if the edge is not marked.
Issued: Traffic Guidance Scheme & Scope of Works Uncontrolled when printed
Revised: Version 1 Author: Shaylene Rubach Approved by: Wayne Grice Page 3 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.