11. Taper Lengths (Highlight Taper required)
Table 4.6
Permanent posted Recommended taper length, m
speed, km/h
Traffic control at Lateral shift taper Merge taper
beginning of taper
40 or Less 15 5 15
50 15 15 30
60 30 30 60
70 30 60-80 120-160
80 30 60-80 120-160
90 30 60-80 120-160
100 30 60-80 120-160
Greater than 100 30 60-80 120-160
The speed of traffic in Table 4.6 is the permanent posted speed of the road before the work
site is established.
12. Are there Bus Stops Taxi Ranks to be considered? There is one bus stop just east of the site
and will not be impacted by any movements in and out of the site.
13. Pedestrian and Cyclist control? Cyclist will need to follow traffic past the site via the
roadway. Pedestrians will be moved closer to the kerb.
14. Are Local Businesses and property owners affected? All residents and local business will
have continual access to their driveways.
15. Is Containment Fencing on site? N/A
16. Area of Job Site: Length ….m Width: ….m
17. Traffic Controller Sign
Issued: Traffic Guidance Scheme & Scope of Works Uncontrolled when printed
Revised: Version 1 Author: Shaylene Rubach Approved by: Wayne Grice Page 4 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.