Council archive · source document
Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239
Plans and drawings: the text below has words only, no drawings.
Risk Assessment Schedule Likelihood (1-5), Consequence (1-5), Risk Level (L-VH)
Ref Risk Associated Safety Hazard Curren Safety Control Residual Action Required By
. With t Risk Measure(s) Required Risk
Description Description
1. Work Area/Workers Work area is inside 4 Permanent signage ad 2 Client
the normal travel footpath signage to be
path. implemented to notify
the public of site traffic
moving in the vicinity
of the work site.
2. Pedestrians Pedestrians moving 4 Pedestrians will be 2 Client
within the work moved closer to the
area and kerb past the site.
tripping/falling.
4. Traffic Traffic being 4 Signage will be onsite 2 Client
confused by the to ensure all vehicles
truck movements pass the site safely and
near site. all public are notified of
truck movements in
and out of site.
6 Local Access Local residents not 4 Access to driveways to 2 Client
being able to access be maintained at all
properties and times.
worksite causing
delays
Issued: Traffic Guidance Scheme & Scope of Works Uncontrolled when printed
Revised: Version 1 Author: Shaylene Rubach Approved by: Wayne Grice Page 9 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.