1.3 Purpose of Environment Management Plan
This Environmental Management Plan (EMP) for Infinity Apartments – Gympie Tce Noosaville has
been prepared as a reference document. This document outlines the measures McNab will put in
place to manage any real or potential negative environment impacts throughout the construction
phase of the project.
The EMP is association with the Project Risk Register considers the environmental impacts and
details the control measure to be implemented to mitigate and manage the adverse impacts.
The EMP has been developed specifically for the project and reflects current legislation
requirements, standards, and best practices.
The EMP is a reference document to ensure that the activities permitted during the construction
phase are undertaken in accordance with those conditions of the development approval which
regulate environmental issues during the construction phase.
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 6 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.