mcnab construction
07-DOC-003 Rev 4
4 Roles and responsibilities
4.1 Client representative
McNab’s client, Hunter Hopkins has nominated name of Andrew Robinson as their environmental
representative.
The Environmental Representative is responsible for overseeing the Project Team implementation
performance and to facilitate compliance with this document and any environmental approvals.
4.2 Construction Manager
The Construction Manager is responsible for ensuring that construction activities are undertaken in
accordance with McNab’s stated Environmental Policy and Objectives and the provisions of the
Project EMP; and ensuring that all staff carrying out functions with may create a significant impact
on the environment are adequately trained.
4.3 Health, Safety, Environmental and Quality (HSEQ) Manager
The HSEQ Manager represents McNab on all environmental matters. The McNab HSEQ Manager is
responsible for:
• Assisting the Project Manager with the implementation of the EMP
• Providing support and technical assistance to the Project Team
• Assisting with all complaints received and guiding the outcome for all involved
• Monitoring the effectiveness of the Environmental System.
The McNab HSE Manager is authorised to ensure that all employees comply with the provisions of
the documented environmental management system and may issue directions to that effect.
4.4 Project Manager
The Project Manager reports to the Construction Manager and is responsible for ensuring that
effective environmental controls are implemented for the duration of the project.
Specifically, the Project Manager is responsible for:
• Developing the EMP in conjunction with the HSE Team
• Approving the EMP
• Reviewing, implementing and maintaining the provisions of the Project EMP
• Undertaking a review of environmental aspects at Project Start-up and completing a Site
Environmental Checklist to confirm that fundamental requirements have been
addressed
• Providing guidance, motivation and resources to achieve the provisions of the Project
EMP.
• Ensuring that subcontractors and suppliers are aware of McNab’s Policy and Objectives,
through conditions of contract and site inductions as applicable.
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 11 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.