• Establishing environmental controls, monitoring performance, keeping records and
ensuring the scope and frequency of monitoring activity satisfies the requirements of
the Project EMP.
The Project Manager shall have sufficient authority and independence to:
• Identify and record any environmental problems
• Initiate solutions to these problems
• Stop the works, if such a decision becomes necessary, in order to prevent or mitigate
adverse environmental conditions, or if corrective measures are not being carried out
• Identify and assess whether any departure from the Project EMP should be recorded as
a Non-Conformance.
I, Steve O'Connor, will adhere to the relevant Environmental Legislation, Statutory requirements and
McNab’s Policies and Procedures set out in the Environmental Management System and will comply
with any reasonable environmental instruction.
I acknowledge receipt of and understand my responsibilities and agree to ensure an environmentally
responsible workplace is achieved and maintained.
Name: Steve O'Connor Signature: Date:
4.5 Site Foreman/Manager
The Site Foreman/Manager will assist the project manager to:
• Ensure that all work under the Site Foreman/Manager’s control is undertaken in
accordance with the statutory environmental requirements and the Project EMP.
• Identifying, recommending and initiating solutions to any Project environmental
problem.
• Ensuring that all workers and subcontractors under the Site Foreman/Manager’s control
are properly inducted in the requirements of the Environmental Policy and Objectives
and the EMP and instructed to the following:
The role and environmental responsibilities of the job for they are engaged
The use an understanding of the environmental documentation for the work
Specific environmental procedures for the job.
I, Michael Burgoyne will adhere to the relevant Environmental Legislation, Statutory requirements
and McNab’s Policies and Procedures sect out in the Environmental Management System and will
comply with any reasonable environmental instruction.
I acknowledge receipt of and understand my responsibilities and agree to ensure an environmentally
responsible workplace is achieved and maintained.
Name TBA Signature: Date:
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 12 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.