Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                 mcnab construction
                                                                                  07-DOC-003 Rev 4
      •     Establishing environmental controls, monitoring performance, keeping records and
            ensuring the scope and frequency of monitoring activity satisfies the requirements of
            the Project EMP.
            The Project Manager shall have sufficient authority and independence to:
      •     Identify and record any environmental problems
      •     Initiate solutions to these problems
      •     Stop the works, if such a decision becomes necessary, in order to prevent or mitigate
            adverse environmental conditions, or if corrective measures are not being carried out
      •     Identify and assess whether any departure from the Project EMP should be recorded as
            a Non-Conformance.

I, Steve O'Connor, will adhere to the relevant Environmental Legislation, Statutory requirements and
McNab’s Policies and Procedures set out in the Environmental Management System and will comply
with any reasonable environmental instruction.

I acknowledge receipt of and understand my responsibilities and agree to ensure an environmentally
responsible workplace is achieved and maintained.

Name: Steve O'Connor Signature:                                 Date:

4.5            Site Foreman/Manager
The Site Foreman/Manager will assist the project manager to:

      •     Ensure that all work under the Site Foreman/Manager’s control is undertaken in
            accordance with the statutory environmental requirements and the Project EMP.
      •     Identifying, recommending and initiating solutions to any Project environmental
            problem.
      •     Ensuring that all workers and subcontractors under the Site Foreman/Manager’s control
            are properly inducted in the requirements of the Environmental Policy and Objectives
            and the EMP and instructed to the following:
                    The role and environmental responsibilities of the job for they are engaged
                    The use an understanding of the environmental documentation for the work
                    Specific environmental procedures for the job.

I, Michael Burgoyne will adhere to the relevant Environmental Legislation, Statutory requirements
and McNab’s Policies and Procedures sect out in the Environmental Management System and will
comply with any reasonable environmental instruction.

I acknowledge receipt of and understand my responsibilities and agree to ensure an environmentally
responsible workplace is achieved and maintained.

Name TBA        Signature:                              Date:




Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                   Page 12 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.