6.2            Environmental incident procedure
In the event of an Environmental Incident or Complaint (as outlined in section 7.0 of this document),
the procedure is as follows:

      •     Notify the Site Foreman immediately
      •     Isolate or divert the damaging energies (e.g. turn off water supply)
      •     Contain the incident, such as using spill booms, sandbags, earth or other available
            materials.
      •     Notify the people listed below:
                    Site Foreman
                    HSEQ Manager
                    Project Manager
                    Construction Manager
                    Managing Director
                    Client Representative

Complete the Incident Report and include with all available information including photographs,
substances, materials or equipment involved including suspected quantities (e.g. volume of escaping
substance or the like). Forward the completed report to the HSEQ Team ([email protected]).

6.3            Environmental complaints procedure
McNab HSEQ Manager is nominated as responsible for the Complaint Register. The register will
detail the nature of any complaint and the proposed course of action considered necessary.

The McNab Project Manager and/or the HSE Manager shall investigate all environmental complaints
which shall be record on the project records.

Where consider appropriate McNab will notify the Client or the Client’s Representative of the
complaints received. Complaints received by the Client or the Client’s Representative will be
registered on the project record and be subject to investigation by McNab.

 Action                                            By Whom             By when
 Compliant received by Site Foreman/Manager        Site Foreman        Available anytime. The
                                                                       contact details will be
                                                                       displayed on the Front of the
                                                                       Site.
 Site Foreman/Manager raises an                    Site Foreman        Within 8 hours.
 Environmental Complaint Form (Form 14.01).
 Noting information about the complaint and
 the complainant.
 Site Foreman/Manager contacts the Project         Site Foreman        Within 8 hours, or
 Manager and McNab HSE Manager regarding                               immediately if an emergency
 the complaint                                                         situation.
 If appropriate Project Manager to contact the     Project             Immediately after being
 Site Superintendent                               Manager             informed.



Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                     Page 18 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.