6.2 Environmental incident procedure
In the event of an Environmental Incident or Complaint (as outlined in section 7.0 of this document),
the procedure is as follows:
• Notify the Site Foreman immediately
• Isolate or divert the damaging energies (e.g. turn off water supply)
• Contain the incident, such as using spill booms, sandbags, earth or other available
materials.
• Notify the people listed below:
Site Foreman
HSEQ Manager
Project Manager
Construction Manager
Managing Director
Client Representative
Complete the Incident Report and include with all available information including photographs,
substances, materials or equipment involved including suspected quantities (e.g. volume of escaping
substance or the like). Forward the completed report to the HSEQ Team ([email protected]).
6.3 Environmental complaints procedure
McNab HSEQ Manager is nominated as responsible for the Complaint Register. The register will
detail the nature of any complaint and the proposed course of action considered necessary.
The McNab Project Manager and/or the HSE Manager shall investigate all environmental complaints
which shall be record on the project records.
Where consider appropriate McNab will notify the Client or the Client’s Representative of the
complaints received. Complaints received by the Client or the Client’s Representative will be
registered on the project record and be subject to investigation by McNab.
Action By Whom By when
Compliant received by Site Foreman/Manager Site Foreman Available anytime. The
contact details will be
displayed on the Front of the
Site.
Site Foreman/Manager raises an Site Foreman Within 8 hours.
Environmental Complaint Form (Form 14.01).
Noting information about the complaint and
the complainant.
Site Foreman/Manager contacts the Project Site Foreman Within 8 hours, or
Manager and McNab HSE Manager regarding immediately if an emergency
the complaint situation.
If appropriate Project Manager to contact the Project Immediately after being
Site Superintendent Manager informed.
Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan Page 18 of 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.