Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                  mcnab construction
                                                                                   07-DOC-003 Rev 4

9     Monitoring
Environmental conditions are informally monitored on a daily basis. If formal monitoring is
performed, it will be noted on the Project Risk Register.

9.1            Auditing
In addition to regular monitoring as set out in this plan, Environmental Management Systems audits
will be undertaken as per the Internal Audit Procedure (McN-QP-112).

PQC Audits

Systems deficiencies, adverse, or potentially adverse environmental conditions arising from site
activities may be subject to the issue of Environmental Non-Conformances or Corrective Action
requests.




Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                   Page 23 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.