                                                                                     mcnab construction
                                                                                      07-DOC-003 Rev 4

10 Appendix 1 – Environmental Site Procedures
10.1            Site establishment
Objective
   •      Compliance with obligations under the Act and any Development Approval conditions
   •      Minimisation of potential environmental risks from activities

Management Strategy
  •     Communication with surrounding neighbours about works on site via a letterbox drop
  •     Site management controls are set up in accordance with the stormwater and erosion
        plan (refer to Appendix 2)
  •     Ensure the EMP Aspects Register is completed
  •     All staff working on site are to undertake a site-specific induction to be delivered by the
        Site Foremen/Manager or McNab representative
  •     Site facilities and stockpiles are to be established and stabilised as early as practicable to
        prevent undue disturbance to vegetation and soils as works progress
  •     Site facilities are to be located in a flat area at least 20m from drainage paths and the
        waterway
  •     Controls and protection measures such as bund or geo-fabric covers should be
        established prior to works commencing where possible

Action / Corrective Action
   •      Implement Management Strategies as above
   •      Corrective measures are to be agreed to in conjunction with the HSE team

Performance Indicators
   •     Evidence of Site Induction by personnel
   •     Site Facilities and stockpiles placed in accordance with the above management strategy

10.2            Community consultation
Objective
Adjoining stakeholders should understand the extent of works and the impact that works may have
on them.

Management Strategy
Stakeholders must be aware of the potential impacts and duration of works, in addition to the
process for making complaints.

Any concerns/ complaints raised by the community should be addressed in accordance with the
complaints procedure.

Action / Corrective Action
Send correspondence to adjoining stakeholders notifying of works.

Ensure that information is available at the access points in the form of a builder’s sign, including
phone numbers of designated personnel.




Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                       Page 24 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.