Skip to the record
The only place to find full transcripts.

Council archive · source document

Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                               mcnab construction
                                                                                07-DOC-003 Rev 4



Management Strategy
  •     Access each work area to determine the status in relation to weeds. If declared weeds
        are present, the area will be quarantined
  •     All vehicles will be cleaned in the wash down area and inspected by a qualified person
        prior to leaving the quarantine area. The areas will be noted on a site plan and clearly
        defined on the site
  •     Vehicle movements will be encouraged not to leave formed surfaces
  •     Water used for cleaning vehicles will be collected for settlement and any weeds, which
        germinate in settlement areas, will be destroyed. This will be done in a wash down bay
        that complies with the Queensland Guideline for the construction of Vehicle and
        Machinery Wash down Facilities
  •     Weekly inspections will be done on sites for the detection of weed species (refer McNab
        Weekly Environmental Checklist). Any found will be reported to the Project Manager
        and client representative
  •     Where a site is located within a weed zone, high risk machinery (e.g. earthworks) will be
        required to be cleaned prior to departure. Once the area has roads formed, vehicles
        travelling in and out along these will not require a wash down unless found to contain
        weeds. A hygiene certificate and inspection will still be required

Action / Corrective Action
   •      Corrective actions will be specific to the non-conformance:
                  Review inspection procedures for vehicles as required
                  Re-train staff that are found not to understand or adhere to wash down or
                   inspection protocols
                  Review control and reporting methodologies
                  Review corrective actions effectiveness through monitoring protocols
   •      Incidents and inspection based identification of weed management project work areas
   •      Monitoring and reporting. All records of weeds found on site are to be made available to
          the administering authority on request
   •      Weekly checks for the establishment of weed will be undertaken via the environmental
          inspection checklist
   •      All vehicles and goods coming to site must be accompanied by a weed hygiene
          declaration form (contact Biosecurity Queensland 13 25 23)
   •      Any non-conformances and incidents are to be reported as per the client or project
          Incident Reporting and Investigation Procedure




Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                 Page 37 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.