Skip to the record
For the highest quality transcripts.

Council archive · source document

Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                               mcnab construction
                                                                                07-DOC-003 Rev 4




Management Strategy
  •     Where suppliers are operating from a restricted area, only use those that have a DAF
        Approved Risk Management Plan (ARMP)
  •     In addition to the start-up inspection, the Project Manager will engage a DAF approved
        Fire Ant Inspector to check work site and a surrounding 10 metre radius (buffer zone) for
        the presence of RIFA and every 28 days during the project
  •     All incoming Fire Ant Carriers (i.e. Soil, hay, potted plants, quarry material) must be
        visually inspected prior to unloading or as soon as practicable
  •     All incoming restricted plant found to contain fire ants must be reported immediately to
        Biosecurity Queensland
  •     Keep records (for a 12 month period) of all incoming restricted plant. Records should
        detail the nature, quantity and source of materials imported to the site. Records shall be
        kept on site
  •     Random audits comprising visual inspections by the Site Foreman or other trained
        personnel should be undertaken for incoming restricted plant
  •     Plant is not to be accepted onto a work site unless free of all soil deposits
  •     Any restricted plant that may be moved off-site at a later date are to be stored as per
        McNab’s DAF Approved Fire Ant Management Plan
  •     All restricted material must remain within the restricted area or be disposed of at a
        Biosecurity Queensland approved landfill
  •     Fire Ant sightings must be reported to Biosecurity Queensland on 13 25 23 within 24
        hours
  •     Fence off suspected nests and seek advice from the Biosecurity Queensland before
        proceeding with works
  •     If the project site is located within a Fire Ant Restricted zone. The work site should be
        managed in accordance with McNab’s DAF Approved Fire Ant Management Plan

Action / Corrective Action
   •      Follow McNab’s DAF Approved Fire Ant Management Plan
   •      Contact the Biosecurity Queensland for additional advice and direction

Performance Indicators
   •     No importation or spread of fire ants from McNab’s site
   •     No personnel injured due to fire ant bite

10.20          Weed Management
Objective
   •      Prevention of the importation of declared plants or noxious weeds into the construction
          and operational zones
   •      To comply with the statutory EA conditions and Project EIS
   •      No spread of weeds to any other location as a result of vehicle movements and
          construction activities
   •      Wash-down facilities to comply with DEHP design guidelines



Infinity Apartments – Gympie Tce Noosaville Environmental Management
Plan                                                                                Page 36 of 39

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.