Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Construction Mangement Plan Reference Document OPW19-0239 · OPW19/0239

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                        mcnab construction
                                                                              Construction Management Plan
                                                                                       for Infinity Apartments
3.      SITE ESTABLISHMENT
3.1 Site Amenities

     McNab is seeking to install a temporary footpath, 1500mm wide, to enable site amenities to be
     located on the existing foot path, see site set up plan below.

3.2 External Hoardings & Gantries

     Temporary fencing / hoardings will be erected to restrict access to the site from members of the
     public. Temporary fencing / hoardings will be erected prior to commencement of works, adjusted as
     required and remain in place until a time where the building itself is secure.




                                                      05-DOC-001 Rev 0 - Construction Management Plan p8 of 16

Used in these records

About this file

File size
7.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Construction Mangement Plan Reference Document OPW19-0239.pdf · 7.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.