mcnab construction
Construction Management Plan
for Infinity Apartments
4. COUNCIL ASSETS
4.1 Parking Meters & Spaces
During the course of construction, McNab will be seeking to have three parking bays designated as
“Construction Zone” to facilitate safe and efficient loading and unloading of materials. Where any
car space closures are required, approvals/permits must be obtained from the relevant authority/s.
4.2 Ground Water and Stormwater Discharge
During construction ground and stormwater will need to be discharged from site. Prior to discharge
all water will be treated in line with Noosa Council requirements and test results kept on site. Water
will then be discharged into existing kerb and channel system.
Sediment and erosion control measures will be established before ground disturbance in line with
civil engineering plan 28929-OW2.1
Sediment and erosion controls will be monitored daily and adjusted as the project evolves. Any
deviation for approved plans will be approved by the project civil engineer.
Final Stormwater service will be provided to the site in accordance with operational works
OPW19/0205 lodged on 17.09.2019. Stormwater, after treatment, will be discharged into the
existing kerb and channel system via multiple kerb adaptors.
5. AUTHORITY CONNECTIONS
5.1 Electrical/Telecommunications Infrastructure
Electrical infrastructure will be installed by McNab within the footpath to enable ENERGEX to supply
power to the development. Power will be drawn for an existing greenbouy. Minimal disruptions are
anticipated during these works.
5.2 Potable Water Service
Potable water service will be provided to the site in accordance with SCG Engineering Plans 28292-
OW4.1 B. Unity Water approval will be gained prior to works being carried out.
5.3 Waste Water Service
Wastewater service will be provided to the site in accordance with SCG Engineering Plans 28292-
OW4.1 B. Unity Water approval will be gained prior to works being carried out.
05-DOC-001 Rev 0 - Construction Management Plan p9 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Construction Mangement Plan Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.