10/0662 - Operational Works [As Published] · 142010.662
2009/1689
28.
The approved maintenance plan shall be incorporated in the Community Management
Scheme for the development and a copy of this shall be provided for Council's records prior
to commencement of the approved use.
A Development Permit for Building Works shall not be granted until a Development Permit
for Operational Works has been issued in regard to the drainage scheme
All site stormwater drainage shall be by means of a gravity system.
Water Supply and Sewer Mains
29.
30.
31.
32.
33.
34.
Reticulated water supply and sewerage must be provided to the development.
Buildings and structures, including the swimming pool, must maintain a minimum clearance
of 1.5 metres from Council sewer mains, and 1.0 metre from the sewer inspection opening.
Separate 25mm PE water services must be installed to a common lot boundary with
independent meters installed outside the boundary of the lot in accordance with Sunshine
Coast water standard drawing SCW 361. Meters must be “Elster” PSM 50100/39 (dual
check),
Storm water retention systems and gross pollutant traps must maintain a minimum clearance
of 1.5 metres from Council sewerage infrastructure.
Landscape planting within 1.5 metres of Council sewerage infrastructure must be Council
approved varieties and low growing when mature.
Construction works undertaken in the vicinity of Council! water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.
Service Easements ,
35, No building or other structure shall be constructed or encroach over an easement.
Earthworks
36. Earthworks required on site shail be carried out in accordance with Council's Planning
Scheme Policy PSP5 ~ Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or the blockage of, or interference with, any natural
watercourses.
37, Earthworks carried oul on site shall not affect the structural integrity of any of the existing
fences and/or structures and/or lands that border the development site. Fences that are
affected shall be replaced prior to the Building Certifler issuing the Certificate of
Classification. In this regard any fences to be replaced shall be clearly shown on the plans
submitted for Operational Works approval.
Site Stabllity
38.
A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soll classification, establish whether any measures are required lo protect the
Stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development. The
recommendations of this report shall be Incorporated into the design and construction of the
proposed development.
Erosion and Sediment Control
39,
Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, contratled gravel access to the site and
controlled disposal of waste, will be necessary.
Page Sof tt
{
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0662 - Operational Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.