10/0662 - Operational Works [As Published] · 142010.662
2009/1689
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to oblaining a Development Permit for
Operational Works.
General
40.
41.
42,
43.
44,
45,
For the following classes of work associated with development, a Development Permit for
Operational Works must be obtained prior to commencement of works relating to that class
of work. The application may combine any or all of these classes of work.
A suitably qualified Registered Professional Engineer shall Prepare engineering drawings
and specifications for all engineering works that will become Council infrastructure, which
shall be submitted in conjunction with an application for a Development Permit for
Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed
cadastre layout Is to be submitted In conjunction with any application for Operational Works.
Digital detailed designs including drawings, calculations, specifications etc, shall be
submitted with any application for a Development Permit for Operational Works in respect of
roadworks and stormwater drainage works. The design shall be in accordance with Council's
Planning Scheme Policy PSP05S - Engineering Design Standards — Roads, Drainage and
Earthworks, To avoid conflict with underground pipes or services, all existing and proposed
services required by the development shall be shown on the plans,
Any damage caused to any public ulility during the course of construction shall be repaired
to Council's standards and at no cost to Council.
Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Infrastructure Contributions
46.
The applicant must pay contributions towards trunk infrastructure in accordance with the
following Planning Scheme Policies and Council Policies:
(a) Planning Scheme Policy 12 - Public Open Space Contributions:
(b) Planning Scheme Policy 13 - Contributions in Lieu of Off Street Parking;
(c) Planning Scheme Policy 16 - Sewerage Headworks Contributions:
(d) Planning Scheme Policy 17 - Water Supply Headworks Contributions:
(e) Planning Scheme Policy 20 - Pathway Trunk Network Contributions:
(f) Council Policy ~ Rural Roadworks Contributions:
{g) Council Policy - Master Drainage Contributions.
For material change of use of premises approvals the contributions must be paid prior to the
commencement of use, for reconfiguring a lol approval contributions must be paid prior to
Council approval of the plan of subdivision.
The actual amount of the contribution must be calculated and paid in accordance with the
Planning Scheme Policies and variations due to indexation current at the time of payment.
Page 6 of 1!
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0662 - Operational Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.