Council archive · source document
10/0662 - Operational Works [As Published] · 142010.662
2009/1689 Car Parking 18. 19. 20. Carparking shall be provided within the site generally as shown on drawing number 08-3781 issue E dated 10 March 2010 by Burleigh Design, except as modified herein. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004 for user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m. All carparking shall be kept and maintained in a condition fit for use. Frontage Works 21. 22. 23. 24. Footpath improvements such as topsoiling, grassing, and tree planting are required to the Grant Street frontage of the site in accordance with Planning Scheme Policy PSP03 Landscaping Plants & Guidelines. Grass shall be couch, free of weeds. A new 1.5m wide concrete path shall be constructed along the Grant Street frontage of the site in accordance with Council's design standards and to an alignment that protects any significant vegetation or any underground services. All paths, driveways and parking areas shall be designed and constructed to ensure pedestrian safely using non-slip materials, to produce an evenly graded surface finish, and to be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1 Design for Access & Mobility. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel, footpath paving and landscaping such as trees and grasses in accordance with Council's Standard specifications prior to commencement of the use permitted by this permit. » Roof Water & Stormwater Drainage > 25, 26. 27. Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank that is installed to ensure water from the rainwater storage system or tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the Queensland Development Code (QDC) current at the time of building approval, and shail be part of the plumbing application for approval. The location and capacity of the tanks shali be clearly shown‘on the plans submitted for Building Works and Operational Works approval and any overfiow shall be directed to the stormwater drainage system located at the rear of the property. All stormwater drainage (including roof water overflow from the rainwater storage system) shall be collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged to the stormwater drainage system located at the rear of the property. To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap provided on site prior to being permitted to discharge into Council's drainage system. All other clean stormwater, such as roof water, can be collected on site and discharged through a single underground drain ling directly into the existing drainage system, bypassing the grease/oil arrestor/gross pollutant trap. To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors/gross pollutant trap, which shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. Page 4 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0662 - Operational Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.