Council archive · source document
10/0662 - Operational Works [As Published] · 142010.662
2009/1689 28. The approved maintenance Blan ‘shall be incorporated in the Community Management Scheme for the development and a copy of this shall be provided for Council's records prior to commencement of the approved use. A Development Permit for Building Works shall not be granted until! a Development Permit for Operational Works has been issued in regard to the drainage scheme. All site stormwater drainage shall be by means of a gravity system. Water Supply and Sewer Mains 29. 30. 31. 32. 33, 34. Service Easements , Reticulated water supply and sewerage must be provided to the development. Buildings and structures, including the swimming pool, must maintain a minimum clearance of 1.5 metres from Council sewer mains, and 1.0 metre from the sewer inspection opening. Separate 25mm PE water services must be installed to a common lot boundary with independent meters installed outside the boundary of the lot in accordance with Sunshine Coast water standard drawing SCW 361. Meters must be “Elster” PSM 50100/39 (dual check). Storm water retention systems and gross pollutant traps must maintain a mininum clearance of 1.5 metres from Council sewerage infrastructure. Landscape planting within 1.5 metres of Council Sewerage infrastructure must be Council approved varieties and low growing when mature. : Construction works undertaken in the vicinity of Council water supply or sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs associated with repair, replacement or alteration of infrastructure must be met by the applicant. > . No building or other structure shall be constructed or encroach over an easement. 35, Earthworks 36. Earthworks required on site shall be carried out in accordance with Council's Planning Scheme Policy PSP5 — Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses, . 37, Earthworks carried out on site shall not affect the structural integrity of any of the existing fences and/or structures and/or fands that border the development site. Fences that are affected shall be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval. Site Stability 38. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site, Proposed development. Erosion and Sediment Control 39, Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary, Page 5 of 11 —e eo a
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0662 - Operational Works [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.