Council archive · source document
Further info - ENTRY FACILITIES-PACKAGE 10.03.2020 · 51901.3604.02
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
C C D
D C
C C D D C C
D CPJ C
C C D D C C
PJ D D D C
C C D L L PS
PS D D L L G
G C C L
PH D D D L PP
G D D L
S PH
D D N N S S
PH D N N N S S PS
D D N P
LM D N L P
D N P
C
LM C C L L L P
C C L L L L LM
C C
C L L L L C LM
C
C L L C C
C SL C
S S L L C
C
G S S L C
S L
S G D D L L L LM L
G S D N D L LM
D D L L
PS S N
N N D LM
G D N N DD
LM L N C N D D C
P D
D D C
L C C D
P P C C
L C C
P P C C C
PS L L C
L
P P L L L C P
L P
C C D L L P
D D L P
C D P P
D D L
C C L
C G G
C C C P
C C C G G
P P
C vC
vv
PP
vv
vGv
FOR TENDER
LEGEND
PROPOSED ADVANCED TREE. REFER CODE P1 TO PROPOSED TREE. REFER CODE TO PLANT PROPOSED PALM. REFER CODE TO PLANT PROPOSED CLIMBERS. REFER CODE TO PLANT PROPOSED LARGE SHRUBS. REFER CODE TO PLANT PROPOSED SMALL SHRUBS. REFER CODE TO PLANT PROPOSED FERNS. REFER CODE TO PLANT
PLANT SCHEDULE. SCHEDULE. SCHEDULE. SCHEDULE. SCHEDULE. AA SCHEDULE. DM SCHEDULE.
P1 LM
HS HV LH AB BC
HB
PROPOSED GROUNDCOVERS. REFER CODE TO EXISTING PALM TO BE RETAINED AND PROTECTED. EXISTING SIGNIFICANT TREES & PALMS TO BE EXISTING PLANTED AREA TO BE RETAINED AND
C PLANT SCHEDULE. RETAINED AND PROTECTED. EXISTING GROUND REHABILITATED. UNDESIRED PLANTS TO BE
A L LEVELS TO BE RETAINED WITHIN TREE PROTECTION APPROVED AND MARKED ON SITE PRIOR TO ANY
ZONES. REFER TO SCHEDULE OF FINISHES. WORK. EXISTING GROUND LEVELS TO BE RETAINED
WITHIN PLANT PROTECTION ZONES. REFER TO
SCHEDULE OF FINISHES FOR BOTH ON GROUND AND
RAISED PLANER ITEMS FOR DETAIL.
NOT FOR CONSTRUCTION
THE BUILDER / CONTRACTOR SHALL VERIFY JOB DIMENSIONS PRIOR TO ANY WORK COMMENCING. FIGURED DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED WORK.
CONLON DATE ISS
09.03.20 D
DESCRIPTION
FOR TENDER
CHKD
MC
CLIENT
CULGOA POINT BEACH PROPOSED ALTERATIONS & PLANTING PLAN
PROJECT LANDSCAPE DOCUMENTATION PACKAGE PROJECT. NO.
420
DWG. NO. ISSUE
GROUP
P 07 5338 8690 E [email protected]
29.10.19 C
09.10.19 B
12.03.19 A
FOR TENDER
FOR TENDER
FOR TENDER
MC
MC
MC RESORT BODY CORPORATE UPGRADES - STAGE 02 ENTRY AREA LEVEL 1 ROOF PLAN
THIS DRAWING IS COPYRIGHT AND THE PROPERTY OF CONLON GROUP PTY. LTD. AND MUST NOT BE RETAINED, COPIED/REPRODUCED OR USED WITHOUT WRITTEN AUTHORITY.
SCALE
A1 1:100 LP307 D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Further info - ENTRY FACILITIES-PACKAGE 10.03.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.