Original source · versioned page text
2019-07-09 S&O Agenda - Item 5 - Attachment 1 - Building and Facilities Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4. Lifecycle Management Plan
4.1 Assets
Council’s buildings and facilities plays a vital role in the services provided to the community across
the Noosa Shire. There are many different asset types within the buildings and facilities asset
management plan, with various units of measurement.
These assets included in this AMP are summarised below:
o Council Office & Depots
o Sporting facilities
o Community Facilities
o Holiday Parks
o Public Amenities
o Leased buildings and facilities - Council owned
o Community Halls
o Libraries and Galleries
o Waste Management – buildings and facilities
4.2 Asset Valuation
The value of the buildings and facilities Assets, at the end of the financial year 2016/2017 for the
purposes of this AMP is summarised below.
Asset Values at 2017/18 Buildings and Facilities
Current replacement cost $ 82,034,000
Depreciable amount $ 82,034,000
Depreciated replacement cost $ 61,958,000
Annual depreciation expense $ 1,463,000
Table 1: Buildings and facilities Asset Valuation
4.3 Asset Condition
Levels of service and asset management decision making is directly linked to asset condition; this
determines what condition the asset should be in before an asset management intervention. The
intent of current and future Condition Assessments (CA) is to:
• Provide a robust and repeatable process for carrying out condition assessments on Council’s
buildings and facilities assets;
• Use condition assessments to develop programs for intervention with regards to further
inspection, monitoring, maintenance and renewals;
• Provide a basis for information for the modelling of condition data for likelihood of asset failure
for those assets not inspected.
A consistent condition ranking scale has been chosen by Council as the framework for measuring
buildings and facilities assets, based on the 1 to 5 ranking according to the International
Infrastructure Management Manual (IIMM). Any asset scoring 4 (fair) to 5 (poor) will be considered
and prioritised under an asset specific renewal program.
Asset Management Plan: Buildings and Facilities Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.