Original source · versioned page text
2019-07-09 S&O Agenda - Item 5 - Attachment 1 - Building and Facilities Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnBuilding condition assessments are undertaken by contracted services due to the volume of asset data attributes that are collected across the Shire. The data collected is utilised to create a renewal program. Condition assessments are cyclic and are staged across a 3-year period to cover all of Council’s buildings and facilities to ensure the continued development of the renewal programs. In addition to the above contracted condition assessments, Council staff undertake visual condition assessments for requests that have been reported for facilities in poor condition. These assessments are undertaken on a “reactive” approach to determine if the request warrants the need for future renewals. The majority of asset classes within the buildings and facilities have had a physical condition assessment undertaken with approximately 10% of the building and facilities assets NOT having a physical condition assessment. For the purpose of this AMP, the assets that have not had physical condition assessments, the condition has been assigned as an age-based condition which is determined on the remaining useful life of the asset and is referred to as the “modelled condition”. Ongoing development and prioritisation will ensure that all buildings and facilities assets are reconciled within the asset system and condition assessments are undertaken. When undertaking condition assessments, the asset attributes are updated prior to the next asset evaluation. The condition assessments will enable the development of renewal programs for the specific assets. In asset reporting an approach to componentisation of the assets to the specific asset class has been undertaken. This breakdown and componentisation of buildings to this level is in accordance with the financial asset standards and enables more detailed condition information at the building component level. These components are detailed below and reported consistently throughout the AMP: Substructure Superstructure Roof Floor Coverings Fit-out and fittings Lighting HVAC Electrical Services Hydraulic Services Mechanical Services Security and Communication Services Specialised Equipment Figure 1 details the total number of building and facility assets by both physical condition and modelled conditions. Any buildings and facilities assets that have reached condition 5 will be included in the relevant renewal programs of the 10-year Capital Works Program. The graph highlights that the majority of our assets are in a good to very good condition. There is a small quantity of assets that have reached condition 5 and these assets have been identified for future renewals. Asset Management Plan: Buildings and Facilities Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.