Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2019-07-09 S&O Agenda - Item 5 - Attachment 1 - Building and Facilities Asset Management Plan

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
          Budget          Forecast        Forecast        Forecast         Forecast      Forecast
 Year     2018/19         2019/20         2020/21         2021/22          2022/23       2023/24
 O&M      $1,397,060       $1,435,241     $1,463,946      $1,493,225       $1,523,089    $1,553,551

          Forecast        Forecast        Forecast         Forecast        Forecast       Forecast
 Year     2024/25         2025/26         2026/27          2027/28         2028/29        2029/30
 O&M       $1,584,622      $1,616,315     $1,648,641        $1,681,614      $1,715,246    $1,749,551

Table 2: Annual Operational & Maintenance Costs across buildings and facilities


Maintenance and operational costs are identified to ensure council understands the whole of life
costs associated with the day-to-day management of buildings and facilities assets. Figure 7 below,
identifies the long term financial commitment required in maintaining assets. In order to maintain
assets to an acceptable level, the cumulative costs over a ten-year period will equate to $16m. It is
proposed to develop a more detailed list of operational and maintenance activities per annum by
service program and utilises the T1 asset management system to identify maintenance by the
breakdown of asset classes within the buildings and facilities asset classes. In addition, more
detailed and longer term planning for maintenance has been identified as an improvement from this
AMP.




Figure 7: Buildings and facilities Operating & Maintenance Costs & Forecast


4.5     Asset Renewals
The purpose of developing a renewal plan is to identify assets that need to be replaced to maintain
the current level of service. Asset failure due to lack of renewal will affect the capacity to deliver
future renewals of buildings and facilities and subsequently the service these facilities provides to
the Noosa Community.

Buildings and facilities asset renewals are condition based. Condition assessments provide staff the
ability to develop capital renewal programs. The ongoing asset management maturity relies heavily
on the continued development of the condition assessments and subsequent maintenance and
renewal plans.




Asset Management Plan: Buildings and Facilities                                                 Page 15
Log in to download the original file

2019-07-09 S&O Agenda - Item 5 - Attachment 1 - Building and Facilities Asset Management Plan(PDF, 3MB).pdf · 3.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.