Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-07-09 S&O Agenda - Item 5 - Attachment 1 - Building and Facilities Asset Management Plan

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Asset Management Plan: Buildings and Facilities   Page 42

Pome                                            SERVICE LEVEL TARGET
   Operations
   (Activities include venue bookings and hire arrangements, regular newsletter, WHS inspections, cleaning, security
    patrols, pe control etc.

   Scheduled activities              Long term hire arrangements — rock     Ongoing
                                     wall (open ended agreement — monthly
                                     fee   ee
                                     Security patrols                        Nightly

                                     Fire testing (emergency lighting, fire  Monthly
                                     extinguishers, fire blankets, fire panels)
                                     RCD (electrical) testing               Twice yearly
                                     Enquiries/management of venue           No defined service level — usually
                                     bookings incl. court hire; conference  completed same business day.
                                     rooms)

                                                                            complexity up to 10 business     days.

    ja a') aed) e ee eae
   NLC is a full service facility, operated “in-house” by Noosa Council, with the exception of the rock wall service, which
   is outsourced to private contractors.

   KEY SERVICE METRICS
    CELT cs                                               Metric              Benchmark Comparison
   This is the extent that each rateable property is funding
   the NLC.
   2017/18 net costs $207 ,844/ 30,000 rateable properties                   2016/17 net cost $240,840 / 30,000 =
   exclusive of depreciation and internal charges         $7 per rateable    $8 per rateable property
                                                          property
   2017/18 net costs $596,677 / 30,000 rateable properties                   2016/17 net cost $466,798 / 30,000 =
   inclusive of depreciation and internal charges         $20 perrateable | $16 per rateable property
                                                          property
   2017/18 cost per visit - 109,108                                          2016/17 cost per visit - 101,877
   exclusive of depreciation and internal charges         $1.90 per visit    $2.36 per visit
   inclusive of depreciation and internal charges)        $5.47 per visit    $4.58 per visit

Asset Management Plan: Buildings and Facilities                                                            Page 42
Log in to download the original file

2019-07-09 S&O Agenda - Item 5 - Attachment 1 - Building and Facilities Asset Management Plan(PDF, 3MB).pdf · 3.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.