Skip to the record
Every meeting, every word.

Original source · versioned page text

2019-07-09 S&O Agenda - Item 5 - Attachment 1 - Building and Facilities Asset Management Plan

of 50

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Asset Management Plan: Buildings and Facilities   Page 43

PERFORMANCE MEASURE
|Service                  si Indicator   | Performance Measure _—'| Methodology
  Noosa Leisure Centre       Satisfaction | Kids’ Playroom — Score 79    Surveys using Net Promoter Score
                                           Café — Score 70.              (NPS) rating. A NPS that is positive
                                                                         (i.e., higher than zero) is felt to be
                                                                         good and an NPS of >50 is excellent.
                                           Noosa community satisfaction | Community satisfaction mean
                                           mean rating score compared    performance rating from the LGAQ
                                           to the State mean rating score | Community Satisfaction Tracking
                                           (out of optimum rating of 5). Survey for Provincial areas for:
                                          [| Frame Commun este Serves
                                           NSC mean       State mean    punction: Sporting & Recreational
                                           rating (2019) | rating (2017)
                                          (405          378

 1 Refer to Asset Responsibility Matrix for specific areas of responsibility.
 ? Data for FY2016-17
 > Timetables for specific programs vary.

Asset Management Plan: Buildings and Facilities                                                      Page 43
Log in to download the original file

2019-07-09 S&O Agenda - Item 5 - Attachment 1 - Building and Facilities Asset Management Plan(PDF, 3MB).pdf · 3.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.