Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2021-11-15 GC Agenda - Item 7 - Attachment 2 - Coastal Hazards Adaptation Plan with tracked changes

of 122

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Inundation adaptation outcomes and associated actions for Noosa North Shore

The assessment of inundation risks within Noosa North Shore shows the level of risk to residential
and road network assets may become intolerable within approximately 20 years. Intolerable risks
to natural areas and biodiversity are more likely than not to eventuate by the year 2070.

Assessment of a range of socio-economic, environmental, and governance considerations, as well
as community feedback during the development of this plan, determine the most appropriate
adaptation pathway for responding to frequent inundation risks in this locality is one that supports
existing accessibility services, visual amenity values and natural ecological processes. Therefore,
the preferred adaptation outcomes are:

    -   The increased inundation risk to service infrastructure assets is accommodated through
        adaptive design.


Figure 16 shows the expected progression of these preferred outcomes between 2020 and 2100.
Table 14. provides a breakdown of actions in support of these outcomes, to be pursued within the
five -year life of this plan.




 Pathways Map Legend
 Star = trigger points (points in time for when a decision needs to be made)
 Circle = commencement or future commencement of adaptation option
 Green solid line = active action on this adaptation pathway
 Green dotted line = effectiveness of this option may be reduced and require
 reassessment




  Figure 1616 - Preferred long-term adaptation pathway response to projected coastal inundation risks in Noosa North
                                                        Shore




Noosa Council – Coastal Hazards Adaptation Plan                                                              Page 63
Log in to download the original file

2021-11-15 GC Agenda - Item 7 - Attachment 2 - Coastal Hazards Adaptation Plan with tracked changes(PDF, 8MB).pdf · 7.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.