Skip to the record
Accept no imitations.

Original source · versioned page text

2021-11-15 GC Agenda - Item 7 - Attachment 2 - Coastal Hazards Adaptation Plan with tracked changes

of 122

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
The following actions will help progress the achievement of these outcomes:

 MANAGEMENT              ACTIONS FOR NOOSA NORTH SHORE – THE NEXT 5 YEARS
 RESPONSE
 AREA

 Land Use                Maintain land use planning approach and ensure alignment with State
 Planning                Planning Policy.

 Public                  Ensure road asset plans and upgrades on Noosa North Shore appropriately
 recreational,           consider periodic tidal inundation risks
 built, and
 Infrastructure          Investigate opportunities for maintaining functional road access to ferry
 assets                  landing area

 Foreshores and          Review and update Council’s Conservation Land Guideline that supports
 Natural Areas           environmental land acquisition, to ensure the risks to Noosa’s biodiversity
                         assets from periodic tidal inundation are appropriately considered

 Other                   Liaise with Local Disaster Management Group to ensure emergency
                         response planning for the rural fire brigade asset on the Homeport Track
                         appropriately considers increasing inundation risks in that area

                         Work with Unitywater to commence investigation of options for reducing
                         inundation risks to residential wastewater systems, including alternatives to
                         on-site septic treatment/holding tanks.

      Table 14 - Five -year action plan for responding to projected coastal inundation risks in Noosa North Shore

Other shire -wide actions are also identified at the beginning of this Section 5.




Noosa Council – Coastal Hazards Adaptation Plan                                                               Page 64
Log in to download the original file

2021-11-15 GC Agenda - Item 7 - Attachment 2 - Coastal Hazards Adaptation Plan with tracked changes(PDF, 8MB).pdf · 7.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.