                                                                         GENERAL INFORMATION
TGS OVERVIEW
The objective of this document is to provide the client, subcontractors and Traffic
Management personnel carrying out works at this location with a specified arrangement for         • Defining and protecting the work area
the signing and delineation of construction and maintenance works which will promote the            The travelled path on the approaches and past the work area shall be delineated
safety of both workers and the public at the work site.                                             so as to properly define which part of the roadway is available to road users, or the path
                                                                                                    that traffic is required to follow, under all reasonably expected weather and
This Traffic Guidance Scheme has been developed based on the brief of information                   atmospheric conditions, day or night as applicable.
provided by the client, as well as a risk assessment of the location and its observed and/or
interpreted risks and associated hazards. The TGS diagram/s detail the traffic control signs,     • Risk management
devices and control measures to be applied at the relevant work sites in order to warn              Risk management entails the identification and analysis of all safety risks likely to arise
traffic and guide it through, past or around the work area.                                         during works on road including the setting up, operating, changing and ultimate
                                                                                                    dismantling of a Traffic Guidance Scheme, followed by the determination of appropriate
The purpose of this Traffic Guidance Scheme is to ensure the safety of all workers within the       measures to mitigate those risks. The process is appropriate at all levels of planning and
work site, as well as the general public.                                                           operation. In each case the process should be carried out by first identifying all the
                                                                                                    hazards likely to arise, evaluating them in terms of likelihood of occurrence and adverse
GENERAL TRAFFIC MANAGEMENT PRINCIPLES                                                               consequences using historical data, experience or other means. The proposed procedural
• A TMR certified Traffic Management Implementation (TMI) Officer must implement (or                statement or Traffic Guidance Scheme should then be checked in detail to ensure that
  directly supervise the implementation of) the TGS. Approval for erection or removal of            adequate means of controlling or reducing those risks found to be significant, are in
  regulatory traffic control devices shall be obtained from the Department of Transport and         place.
  Main Roads or appropriate road authorities before implementing this Traffic Guidance
  Scheme.                                                                                         • Traffic Controllers
                                                                                                    The regulation provides that the function of a traffic controller is to direct traffic in a
• Risk management - Risk management entails the identification and analysis of all safety           way stated in the AGTTM - 7 and the TCASAP.
  risks likely to arise during works on road including the setting up, operating, changing and
  ultimate dismantling of a Traffic Guidance Scheme, followed by the determination of               Traffic controllers shall be relieved from their duty after not more than 2 hours for a
  appropriate measures to mitigate those risks. The process is appropriate at all levels of         period of rest or “other duties” of at least 15 minutes. [NOTE: “Other duties” does
  planning and operation. In each case the process should be carried out by first identifying       not include operation of a STOP/SLOW bat to control traffic or any duties involving
  all the hazards likely to arise, evaluating them in terms of likelihood of occurrence and         standing in one position or controlling traffic with a traffic control device].
  adverse consequences using historical data, experience or other means. The proposed
  Traffic Guidance Scheme should then be checked in detail to ensure that adequate                  Approach speeds to locations where Traffic Controllers are operating shall be
  means of controlling or reducing those risks found to be significant, are in place.               controlled to 60 km/h or less by means of appropriate devices and advance signs
                                                                                                    including a temporary speed zone.
• Positioning of Signs and Devices AGTTM – Part 6 – Section 6.5
 Signs and devices should be positioned and erected so that:                                        Traffic controllers must ensure that they have a clear escape path to a non-traffic
  a) they are properly displayed and securely mounted.                                             (closed) section of the roadway, shoulder, footpath or median. Traffic controllers
  b) they are within the line of sight of the intended road user.                                   must stand facing the traffic but just outside the projected travel path. A traffic
  c) they cannot be obscured from view (for example, by vegetation or parked cars).                 controller must ensure that they are not partially hidden by signs and/or devices
  d) they do not obscure other devices from the line of sight of the intended road                  and they do not obstruct a driver's view of such signs and/or devices. Traffic
     user.                                                                                          controllers shall also be provided, if necessary, to control the movement of plant
  e) they do not become a possible hazard to workers, pedestrians, or vehicles.                     and / or pedestrians through, past or within the trafficable area.
  f) they do not deflect traffic into an undesirable path.
  g) they do not restrict sight distance for drivers entering from side roads or streets,         The Traffic Controller Ahead / PREPARE TO STOP signs shall be used to give
      or private driveways.                                                                       advance warning where traffic may be required to stop in compliance with the
  h) they are not installed using supports that could be a hazard if struck by a vehicle.         directions of a Traffic Controller. Traffic Controller Ahead / Prepare to Stop signs should be
                                                                                                  placed as outlined in AGTTM – 3 – Clause 4.8. These signs shall not be displayed when the
• End of Queue – Primary prepare to Stop signs AGTTM – Part 3 – Section 4.8                       Traffic Controller is not actually in attendance controlling traffic.
  End of Queue calculations are conducted to ensure that pre-warning signage may be
  placed in advance of the expected end of queue position once traffic is held by traffic
  controllers. The calculations are based on traffic volumes and hold times.                      • Signs warning of works personnel
  The “primary Prepare To Stop” sign shall be placed a minimum distance as shown in                 The Workers (symbolic) sign is used to give warning of personnel engaged in
  Table 2.3 of the AGTTM – Part 3                                                                   works on or adjacent to the travelled path. As this sign is used to warn of the
                                                                                                    presence of personnel, it shall only be displayed when they are actually working,
• Installation Process – AGTTM – Part 6 – Section 6.3                                               or are visible to traffic, or both, and shall be removed or covered when workers
The general procedure for setting up a site is to:                                                  have left the work area or are no longer visible to traffic.
1. locate the work area using GPS, landmarks, side streets, chainage
2. install devices as outlined in the TGS for side streets first
3. install devices as outlined in the TGS for the non-working lane (un-affected direction)        • Provision for pedestrians and bicycles - AGTTM – Part 3 – Section 3.10
4. install devices as outlined in the TGS for the working lane (affected direction) to complete     Where pedestrians, including school children and people with disabilities or visual
installation                                                                                        impairment, have to move through, past or around a work site or to cross the road
5. conduct a drive through inspection after all devices are in place and before work                within a work site, they shall be provided with and directed to suitably constructed
commences                                                                                           and protected temporary footpaths and crossing points, or formal pedestrian
                                                                                                    crossings, or refuges if warranted. Pedestrian and bicycle paths should, where
All sign spacings and taper lengths will be noted on the TGS and should be in accordance            practicable, be provided on the same scale and to the same width as any facilities
with AGTTM Part 3.                                                                                  for pedestrian or bicycle traffic that were existing prior to the works.
        In addition to providing adequate traffic control and guidance at a static work site
        the safety of road users will be enhanced by ensuring that the work site is
        managed in such a way as to cause the minimum amount of inconvenience to
        traffic movement. Works should be arranged to minimise -
         (i) disruption of established traffic movements and patterns;
         (ii) interference with traffic at peak movement periods;
         (iii) interference with public transport services; and
         (iv) the amount of road closed to traffic at any one time.

     Delineating devices (e.g. traffic cones, bollards, post mounted delineators) should
     generally be placed 1 m clear of the travelled path where practicable. However,
     traffic cones and bollards may also be used to define the edge of the travelled path




                                                                                                                                                                                                  2

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.