qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                           THROUGH, PAST, AROUND ANALYSIS


                    Traffic Guidance Scheme and Traffic Management Options Analysis
Option     Description              Traffic control     Control            Features                                                               TGS Reference
                                    method              Measure
Around     Vehicles Detoured        Full                Elimination/       Full width of road closed. Detour available with minimum delay         NOT
Work       around existing          Closure/Detour      Substitution
                                                                                                                                                  SELECTED
Zone       roadway/ Side-tracked

Past       Vehicles past            Part Road           Isolation /        Remaining lane width of 3.0m per lane can be maintained on             SELECTED
Work       delineated work zone     Closure /           Engineering /      low speed residential roads                                            QLD-EUMU-TGS8
Zone                                Lateral Shift       Administrative

                                    Shoulder / Bus      Isolation /        Remaining width of 3.0m with 0.5m edge clearance shall be              SELECTED
                                    Lane / Parking      Engineering /      maintained to allow for passage of traffic past work area              QLD-EUMU-
                                    Lane Closure        Administrative                                                                            TGS2,2A,3,3A,4,4
                                                                                                                                                  A,9,9A
                                    Contra - Flow       Isolation /        Where a multi-lane divided road can be utilised to run                 NOT
                                                        Engineering /      opposing lanes of traffic on one side. Remaining lane width of
                                                                                                                                                  SELECTED
                                                        Administrative     3.0m per lane can be maintained.
                                    Lane / Turning      Isolation /        Remaining lane width of 3.0m can be maintained on low speed            NOT
                                    Lane Closure        Engineering /      residential roads, or 3.5m on higher speed roads.
                                                                                                                                                  SELECTED
                                                        Administrative

                                    Single Lane         Isolation/         Where two – way traffic cannot be maintained as per above on           NOT
                                    reversible Flow     Engineering/       two-way road. Remaining width of 3.0m with 0.5m edge
                                                                                                                                                  SELECTED
                                                        Administrative     clearance shall be maintained to allow for single file of traffic
                                                                           past work area
                                    Temporary           Isolation/         Traffic Controller/s may be required to hold traffic in one or         NOT
                                    closure / work      Engineering/       both directions briefly to allow for work vehicle ingress / egress
                                                                                                                                                  SELECTED
                                    vehicle access      Administrative
Through    Vehicles through         Temporary road      Isolation /        Hold and Release all traffic when safe to do so.                       SELECTED
Work       Work Zone                closure/ Hold       Engineering /                                                                             QLD-EUMU-
Zone                                and Release         Administrative                                                                            TGS5&6
                                    Local Traffic       Isolation /        Locations where road features restrict implementation of               NOT
                                    Access              Engineering /      above options
                                                                                                                                                  SELECTED
                                                        Administrative
Short      Works on Road –          Warning             Isolation /        Minimal plant & equipment – time and traffic volume                    NOT
term /     Within Traffic Lane      signage and / or    Engineering /      constraints.
                                                                                                                                                  SELECTED
Low                                 shadow vehicle      Administrative     May be frequently changing work area
impact                              May require                            Able to move quickly onto or off roadway
                                    specialist veh.                        Risk assessment every time
           Works Outside of         Warning             Isolation /        Clear of traffic lane/s                                                NOT
           Traffic Lane             signage and / or    Engineering /
                                                                                                                                                  SELECTED
                                    shadow vehicle      Administrative
Warning    Pre-warning signage      N/A                 Signage            AS1742.3 approved and custom signage as required placed as a           SELECTED
Signage    only                                                            warning to both vehicles and pedestrians                               QLD-EUMU-
                                                                                                                                                  TGS1,1A,7 & 7A



Pedestrian Management
Option               Description                                                                                                                TGS Reference
Around Work Zone     Pedestrians diverted around work area (usually to footpath on other side of road) utilising existing crossing and/         SELECTED
                     or driveway                                                                                                                QLD-EUMU-
                                                                                                                                                TGS2,2A,9,9A
Past Work Zone       Minimum 1.0m footway maintained past work area (on the verge or on the roadway) with appropriate                           NOT SELECTED
                     delineation and protections in accordance with the AGTTM
Through Work Zone    Minimum 1.0m footway maintained through the work zone such that pedestrians are safely managed either                      NOT SELECTED
                     under traffic control (e.g. Passage through /between work area and parked work vehicle, or a designated,
                     delineated walkway through the development area but away from specific work areas.




                                                                                                                                                                3

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.