Council archive · source document
qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (17.3 MB): may take a few minutes to open.
www.invarion.com
W
TRAFFIC GUIDANCE SCHEME (TGS)
N TGS DIAGRAM #
QLDBUILT EUMUNDI NOOSA RD NOOSAVILLE QLDEUMUTGS2A
S
RESIDENTIAL DEVELOPMENT FOOTPATH CONSTRUCTION PEDESTRIAN DIVERSION AFTERCARE
E
LEGEND
INSET DIAGRAM
= SIGNAGE PLACEMENT
= DEVELOPMENT AREA
= EXISTING FOOTPATH
PEDESTRIANS
FOOTPATH
OTHER
PEDESTRIANS BACK
USE
= WORK AREA
ONTO VERGE
FOOTPATH
CLOSED
= 700mm CONES / BOLLARDS
FOOTPATH
CLOSED
= PEDESTRIAN DIVERSION
HE
AD
= TEMPORARY HAZARD MARKER
LA
N
D
= BOLLARDS WITH FLAGGING
DR
= PEDESTRIAN BARRIER MESH
CLOSE DELINEATION
PEDESTRIANS BACK
ONTO VERGE
STA
RBO
SHARE
REDUCE SPEED
ROAD CLOSED
THE
ARD
D
EN D
A
50
RO RK
LANE
BIKE
AVE
LY
WO FE
SA
IVE
DR
DRIVE SA
WORK
ROAD
END
RE
FELY
60
45m
DU
CE
40 D
HA
DAE W
SP
KRO R
EE
END DAO
D
ROA K
WOR
Y
FEL
E SA
DRIV
15m D
AR
REDUCE
65m OS
NO
DI
ROAD
WORK
AHEAD
N
SPEED
MU
EU
TGS NOTES
1). THIS ARRANGEMENT IS DEVELOPED IN ACCORDANCE WITH THE QGTTM AND AS1742.3
2) ALL SIGNS TO BE MOUNTED IN PROMINENT POSITIONS WITH CLEAR LINE OF SIGHT TO ONCOMING TRAFFIC.
3). SIGNS THAT ARE INAPPROPRIATE TO, OR CONFLICT WITH, THE WORKSITE SITUATION SHALL BE COVERED OR REMOVED.
4). SIGNAGE PRESENT FOR UP TO TWO WEEKS MAY BE ERECTED ON PORTABE LEGS 200mm ABOVE THE SHOULDER SURFACE TO THE BOTTOM EDGE OF THE SIGN.
5). WORKMAN (SYMBOLIC) SIGNS TO BE COVERED WHEN WORKERS HAVE LEFT THE AREA OR ARE NO LONGER VISIBLE TO TRAFFIC.
6). CLOSE DELINEATION SHOULD BE USED AT THE CORNER OF HEADLAND DR AND EUMUNDI NOOSA RD TO PROVIDE SEPERATION FOR PEDESTRIANS.
7). FOR ADDITIONAL NOTES & GUIDANCE PLEASE REFER TO THE TGS COVER SHEETS SUPPLIED WITH THIS DIAGRAM.
TGS DETAILS: TGS# QLDEUMUTGS2A CLIENT / TRAFFIC MANAGEMENT DETAILS SITE DETAILS TRAFFIC MANAGEMENT TIME FRAMES DESIGNER DETAILS
REV DATE DESCRIPTION CLIENT NAME: QLDBUILT LOCATION: EUMUNDI NOOSA RD TGS IMPLEMENTATION DATE: TBA
REVISIONS
00 12/02/24 PRODUCED FOR CONSTRUCTION PROJECT MANAGER: DOMINIC TYACKE 0410 332 167 PRIMARY ROAD AFFECTED: EUMUNDI NOOSA RD PROJECT DURATION: UP TO 14 MONTHS Kyle Halliday
Dept. Transport & Main Roads
01 SITE CONTACT: LANCE HOLLAND 0432 028 810 AFFECTED ROAD 2: STARBOARD AVE DURATION OF THIS PHASE: UP TO 2 WEEKS Traffic Management Design
02 TRAFFIC CONTROL Co: TBA AFFECTED ROAD 3: HEADLAND DR HOURS OF OPERATION: OUTSIDE WORKING HOURS Certification # OP1503
03 NOMINATED TC CONTACT: TBA ORIGINAL POSTED SPEED: 60Km/H TERM OF WORKS LONG TERM
TGS REVIEWED BY GUY HALLIDAY TMD # OP259 TRAFFIC MANAGEMENT: STATIC WORKSITE REGULATORY WORKSITE SPEED LIMIT: 40Km/H
PRINT TO A3 NOT TO SCALE CONTROL METHOD: PEDESTRIAN DIVERSION ROAD TYPE: TWO WAY
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.