W
TRAFFIC GUIDANCE SCHEME (TGS)
N TGS DIAGRAM #
QLDBUILT EUMUNDI NOOSA RD NOOSAVILLE QLDEUMUTGS4
S
RESIDENTIAL DEVELOPMENT CENTRE MEDIAN CONSTRUCTION
E
LEGEND
= SIGNAGE PLACEMENT
= WORK AREA
= 700mm CONES / BOLLARDS
= TEMPORARY HAZARD MARKER
= CONCRETE AGITATOR
3.5m LANE WIDTH TO BE MAINTAINED
BUFFER
20m
WA
TCH
FOR
RED
DRIVE SAFELY
WORK
ROAD
END
SH HE
UC
AR
T AD
RO
ES
E
ST
PEE
60
15m
AR
D
BO
RE
AR
DU
30m 22.5m
DA
C
40 D
E
22.5m
SP
VE
EE
SHARE
REDUCE SPEED
ROAD
45m
THE
REDUCE SPEED
40
WATCH FOR
60 Y
REDUCE SPEED
AHEAD
WORK
L
ROAD
FE
3.5m LANE WIDTH TO BE MAINTAINED
SA
45m
E
RE
IV
RO RK
DU
DR
RO ORK
EN AD
W EAD
WO
CE
AH
D
AD
RD
SP
A
EE
OS
D
NO
DI
UN
M
EU
TGS NOTES
1). THIS ARRANGEMENT IS DEVELOPED IN ACCORDANCE WITH THE QGTTM AND AS1742.3
2) ALL SIGNS TO BE MOUNTED IN PROMINENT POSITIONS WITH CLEAR LINE OF SIGHT TO ONCOMING TRAFFIC.
3). SIGNS THAT ARE INAPPROPRIATE TO, OR CONFLICT WITH, THE WORKSITE SITUATION SHALL BE COVERED OR REMOVED.
4). SIGNAGE PRESENT FOR UP TO TWO WEEKS MAY BE ERECTED ON PORTABE LEGS 200mm ABOVE THE SHOULDER SURFACE TO THE BOTTOM EDGE OF THE SIGN.
5). WORKMAN (SYMBOLIC) SIGNS TO BE COVERED WHEN WORKERS HAVE LEFT THE AREA OR ARE NO LONGER VISIBLE TO TRAFFIC.
6). 3m MIN LANE WIDTH REQUIRED FOR ALL OPEN TRAFFIC LANES AT ALL TIMES. WHERE A LANE IS DELINEATED USING CONES / BOLLARDS,
THERE SHALL ALSO BE A CLEARANCE OF 0.5m TO THE DELINEATING DEVICES.
7). WORK TO BE CONDUCTED AFTER 9AM AND BEFORE 2PM TO REDUCE IMPACT TO TRAFFIC DURING PEAK TIMES.
8). WORK VEHICLES TO ENTER FORWARDS AND LEAVE FORWARDS THROUGH DELINEATION.
9). WORK AREA APPROX. 3.5m WIDTH ALLOWING TO 3.5m LANE WIDTHS FROM DELIEANTION.
10). FOR ADDITIONAL NOTES & GUIDANCE PLEASE REFER TO THE TGS COVER SHEETS SUPPLIED WITH THIS DIAGRAM.
TGS DETAILS: TGS# QLDEUMUTGS4 CLIENT / TRAFFIC MANAGEMENT DETAILS SITE DETAILS TRAFFIC MANAGEMENT TIME FRAMES DESIGNER DETAILS
REV DATE DESCRIPTION CLIENT NAME: QLDBUILT LOCATION: EUMUNDI NOOSA RD TGS IMPLEMENTATION DATE: TBA
REVISIONS
00 12/02/24 PRODUCED FOR CONSTRUCTION PROJECT MANAGER: DOMINIC TYACKE 0410 332 167 PRIMARY ROAD AFFECTED: EUMUNDI NOOSA RD PROJECT DURATION: UP TO 14 MONTHS Kyle Halliday
Dept. Transport & Main Roads
01 SITE CONTACT: LANCE HOLLAND 0432 028 810 AFFECTED ROAD 2: STARBOARD AVE DURATION OF THIS PHASE: UP TO 1 WEEK Traffic Management Design
02 TRAFFIC CONTROL Co: TBA AFFECTED ROAD 3: N/A HOURS OF OPERATION: 09001400 Certification # OP1503
03 NOMINATED TC CONTACT: TBA ORIGINAL POSTED SPEED: 60Km/H TERM OF WORKS LONG TERM
TGS REVIEWED BY GUY HALLIDAY TMD # OP259 TRAFFIC MANAGEMENT: STATIC WORKSITE REGULATORY WORKSITE SPEED LIMIT: 40Km/H
PRINT TO A3 NOT TO SCALE CONTROL METHOD: SHOULDER CLOSURE ROAD TYPE: TWO WAY
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.