Skip to the record
The only place to find full transcripts.

Council archive · source document

qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                         www.invarion.com


                    N
                                                                                                                TRAFFIC GUIDANCE SCHEME (TGS)
            W                                                                                                                                                                                                                                  TGS DIAGRAM #
                        E                                                                                  QLDBUILT ­ EUMUNDI NOOSA RD ­ NOOSAVILLE                                                                                            QLD­EUMU­TGS7
                S                                                                                 RESIDENTIAL DEVELOPMENT ­ SITE ENTRY ­ TRUCK WARNING SIGNS




                                                                                                                                                                            CONSTRUCTION

                                                                                                                                                                             PEDESTRIANS




                                                                                                                                                                                                                 CONSTRUCTION
                                                                                                                                                                              WATCH FOR




                                                                                                                                                                                                                  PEDESTRIANS
                                                                                                                                                                               TRAFFIC




                                                                                                                                                                                                                   WATCH FOR

                                                                                                                                                                                                                    TRAFFIC
                                                                                                                                                    TRUCKS MUST TURN AT ROUNDABOUT
                              LEGEND                                                                                                                  TO ENTER SITE LEFT IN, LEFT OUT
                        = SIGNAGE PLACEMENT

                        = DEVELOPMENT AREA

                        = SITE FENCING                                                                       TGS NOTES
                                                                                                             1). THIS ARRANGEMENT IS DEVELOPED IN ACCORDANCE WITH THE QGTTM AND AS1742.3
                        = EXISTING FOOTPATH                                                                  2) ALL SIGNS TO BE MOUNTED IN PROMINENT POSITIONS WITH CLEAR LINE OF SIGHT TO ONCOMING TRAFFIC.
                                                                                                             3). SIGNS THAT ARE INAPPROPRIATE TO, OR CONFLICT WITH, THE WORKSITE SITUATION SHALL BE COVERED OR REMOVED.
                                                                                                             4). LONG TERM SIGNS MOUNTED ON POSTS SHOULD BE ERECTED A MINIMUM OF 2.2m ABOVE KERB OR FOOTPATH TO THE BOTTOM IF THE SIGN.
                        = SITE ENTRY
                                                                                                                 WHERE NEITHER PEDESTRIANS NOR PARKED VEHICLES HAVE TO BE CONSIDERED A MOUNTING HEIGHT OF 1.5m MAY BE MORE APPROPRIATE
                                                                                                             5). THE TRUCKS SIGNS SHOULD ONLY BE DISPLAYED WHEN THE NEED EXISTS AND SHOULD BE COVERED WHEN TRUCK ACTIVITY HAS CEASED.
                                                                                                             6). ALL CONSTRUCTION VEHICLES MUST ENTER AND LEAVE SITE IN A FORWARD DIRECTION. WORK VEHICLES ARE NOT PERMITTED TO STOP
                        = TRUCK APPROACH PATH                                                                    AND/OR REVERSE ON PUBLIC ROADS WITHOUT TRAFFIC CONTROL.
                                                                                                             7). TRUCKS TO HEAD NORTH TO THE ROUNDABOUT TO TURN AROUND AND ENTER SITE TURNING LEFT. NO RIGHT TURN IS PERMITTED ACROSS EUMUNDI NOOSA RD.
                        = TRUCK EGRESS PATH                                                                  8). FOR ADDITIONAL NOTES & GUIDANCE ­ PLEASE REFER TO THE TGS COVER SHEETS SUPPLIED WITH THIS DIAGRAM.

   TGS DETAILS: TGS# ­QLD­EUMU­TGS7                                  CLIENT / TRAFFIC MANAGEMENT DETAILS                   SITE DETAILS                                                TRAFFIC MANAGEMENT TIME FRAMES            DESIGNER DETAILS
            REV DATE                DESCRIPTION                      CLIENT NAME:          QLDBUILT                        LOCATION:                 EUMUNDI NOOSA RD                 TGS IMPLEMENTATION DATE: FROM APRIL 2024
REVISIONS




            00 12/02/24 PRODUCED FOR CONSTRUCTION                    PROJECT MANAGER:      DOMINIC TYACKE ­ 0410 332 167   PRIMARY ROAD AFFECTED:    HEADLAND DR                      PROJECT DURATION:        UP TO 14 MONTHS            Kyle Halliday
                                                                                                                                                                                                                                 Dept. Transport & Main Roads
            01                                                       SITE CONTACT:         LANCE HOLLAND ­ 0432 028 810    AFFECTED ROAD 2:          N/A                              DURATION OF THIS PHASE:  UP TO 14 MONTHS    Traffic Management Design
            02                                                       TRAFFIC CONTROL Co:   TBA                             AFFECTED ROAD 3:          N/A                              HOURS OF OPERATION:      0700­1800            Certification # OP1503
            03                                                       NOMINATED TC CONTACT: TBA                             ORIGINAL POSTED SPEED:    50Km/H                           TERM OF WORKS            LONG TERM
                        TGS REVIEWED BY GUY HALLIDAY ­ TMD # OP259   TRAFFIC MANAGEMENT: STATIC WORKSITE ­ ADVISORY        WORKSITE SPEED LIMIT:     UNCHANGED
                        PRINT TO A3    NOT TO SCALE                  CONTROL METHOD:       WARNING & REGULATORY SIGNS      ROAD TYPE:                TWO WAY

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.