qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (17.3 MB): may take a few minutes to open.
www.invarion.com
N
TRAFFIC GUIDANCE SCHEME (TGS)
W TGS DIAGRAM #
E QLDBUILT EUMUNDI NOOSA RD NOOSAVILLE QLDEUMUTGS7A
S RESIDENTIAL DEVELOPMENT SITE ENTRY TRUCK WARNING SIGNS AFTERCARE
CONSTRUCTION
PEDESTRIANS
CONSTRUCTION
WATCH FOR
PEDESTRIANS
TRAFFIC
WATCH FOR
TRAFFIC
LEGEND
= SIGNAGE PLACEMENT
= DEVELOPMENT AREA
TGS NOTES
= SITE FENCING 1). THIS ARRANGEMENT IS DEVELOPED IN ACCORDANCE WITH THE QGTTM AND AS1742.3
2) ALL SIGNS TO BE MOUNTED IN PROMINENT POSITIONS WITH CLEAR LINE OF SIGHT TO ONCOMING TRAFFIC.
= EXISTING FOOTPATH 3). SIGNS THAT ARE INAPPROPRIATE TO, OR CONFLICT WITH, THE WORKSITE SITUATION SHALL BE COVERED OR REMOVED.
4). LONG TERM SIGNS MOUNTED ON POSTS SHOULD BE ERECTED A MINIMUM OF 2.2m ABOVE KERB OR FOOTPATH TO THE BOTTOM IF THE SIGN.
WHERE NEITHER PEDESTRIANS NOR PARKED VEHICLES HAVE TO BE CONSIDERED A MOUNTING HEIGHT OF 1.5m MAY BE MORE APPROPRIATE
= SITE ENTRY
5). THE TRUCKS SIGNS SHOULD ONLY BE DISPLAYED WHEN THE NEED EXISTS AND SHOULD BE COVERED WHEN TRUCK ACTIVITY HAS CEASED.
6). ALL CONSTRUCTION VEHICLES MUST ENTER AND LEAVE SITE IN A FORWARD DIRECTION. WORK VEHICLES ARE NOT PERMITTED TO STOP
AND/OR REVERSE ON PUBLIC ROADS WITHOUT TRAFFIC CONTROL.
= SIGN COVER 7). TRUCKS TO HEAD NORTH TO THE ROUNDABOUT TO TURN AROUND AND ENTER SITE TURNING LEFT. NO RIGHT TURN IS PERMITTED ACROSS EUMUNDI NOOSA RD.
8). FOR ADDITIONAL NOTES & GUIDANCE PLEASE REFER TO THE TGS COVER SHEETS SUPPLIED WITH THIS DIAGRAM.
TGS DETAILS: TGS# QLDEUMUTGS7A CLIENT / TRAFFIC MANAGEMENT DETAILS SITE DETAILS TRAFFIC MANAGEMENT TIME FRAMES DESIGNER DETAILS
REV DATE DESCRIPTION CLIENT NAME: QLDBUILT LOCATION: EUMUNDI NOOSA RD TGS IMPLEMENTATION DATE: FROM APRIL 2024
REVISIONS
00 12/02/24 PRODUCED FOR CONSTRUCTION PROJECT MANAGER: DOMINIC TYACKE 0410 332 167 PRIMARY ROAD AFFECTED: HEADLAND DR PROJECT DURATION: UP TO 14 MONTHS Kyle Halliday
Dept. Transport & Main Roads
01 SITE CONTACT: LANCE HOLLAND 0432 028 810 AFFECTED ROAD 2: N/A DURATION OF THIS PHASE: UP TO 14 MONTHS Traffic Management Design
02 TRAFFIC CONTROL Co: TBA AFFECTED ROAD 3: N/A HOURS OF OPERATION: OUTSIDE WORKING HOURS Certification # OP1503
03 NOMINATED TC CONTACT: TBA ORIGINAL POSTED SPEED: 50Km/H TERM OF WORKS LONG TERM
TGS REVIEWED BY GUY HALLIDAY TMD # OP259 TRAFFIC MANAGEMENT: STATIC WORKSITE ADVISORY WORKSITE SPEED LIMIT: UNCHANGED
PRINT TO A3 NOT TO SCALE CONTROL METHOD: WARNING & REGULATORY SIGNS ROAD TYPE: TWO WAY
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.