Skip to the record
Beware of cheap imitations.

Council archive · source document

qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                           www.invarion.com


                    N
                                                                                                                                                             TRAFFIC GUIDANCE SCHEME (TGS)
            W                                                                                                                                                                                                                                                                                                    TGS DIAGRAM #
                          E                                                                                                                              QLDBUILT ­ EUMUNDI NOOSA RD ­ NOOSAVILLE                                                                                                                QLD­EUMU­TGS9
                S                                                                                                                        RESIDENTIAL DEVELOPMENT ­ FOOTPATH CONSTRUCTION ­ PEDESTRIAN DIVERSION

                                    LEGEND                                                                                                                                          TGS NOTES
                                                                                                                                                                                    1). THIS ARRANGEMENT IS DEVELOPED IN ACCORDANCE WITH THE QGTTM AND AS1742.3
                                                                                                                                                                                    2) ALL SIGNS TO BE MOUNTED IN PROMINENT POSITIONS WITH CLEAR LINE OF SIGHT TO ONCOMING TRAFFIC.
                                = SIGNAGE PLACEMENT                                                                                                                                 3). SIGNS THAT ARE INAPPROPRIATE TO, OR CONFLICT WITH, THE WORKSITE SITUATION SHALL BE COVERED OR REMOVED.
                                                                                                                                                                                    4). SIGNAGE PRESENT FOR UP TO TWO WEEKS MAY BE ERECTED ON PORTABE LEGS 200mm ABOVE THE SHOULDER SURFACE TO THE BOTTOM EDGE OF THE SIGN.
                                = DEVELOPMENT AREA                                                                                                                                  5). WORKMAN (SYMBOLIC) SIGNS TO BE COVERED WHEN WORKERS HAVE LEFT THE AREA OR ARE NO LONGER VISIBLE TO TRAFFIC.
                                                                                                                                                                                    6). CLOSE DELINEATION SHOULD BE USED AT THE CORNER OF HEADLAND DR AND EUMUNDI NOOSA RD TO PROVIDE SEPERATION FOR PEDESTRIANS.
                                = EXISTING FOOTPATH                                                                                                                                 7). TEMPORARY LIGHTING SHOULD BE USED THROUGH THE DEVELOPMENT SITE AFTER HOURS TO PROVIDE ADEQUATE LIGHTING FOR PEDESTRIANS.
                                                                                                                                 DEEPS ECUDER                                       8). FOR ADDITIONAL NOTES & GUIDANCE ­ PLEASE REFER TO THE TGS COVER SHEETS SUPPLIED WITH THIS DIAGRAM.
                                                                                                                                 DAEHA
                                = WORK AREA                                                                                      KROW
                                                                                                                                 DAOR

                                = 700mm CONES / BOLLARDS

                            = PEDESTRIAN DIVERSION

                            = TEMPORARY HAZARD MARKER
                            = PEDESTRIAN BARRIER MESH
                                                                                                                           45m
                            = INTERNAL LANE WAY

                            = STABLE TEMPORARY SURFACE
                                                                                               RD




                           = CONCRETE AGITATOR
                                                                                              SA
                                                                                           OO




                                                                                                                         DE
                                                                                                                            EP
                                                                                                                   04 S ECUDER
                                                                                          IN
                                                                                      ND
                                                                                 MU




                                                                                                                                                                                                                                                                                   STARBOARD AVE
                                                                           EU




                                                                                  45m
                                                                                                        SN
                                                                                                          AIR
                                                                                                                TS
                                                                                                                  ED
                                                                                                                    EP
                                                                                                              DA
                                                                                                            D EH
                 TA 15m                                                                                  HT ESOL A
                                                                                                           AP C
                   PE                                                                                        TO
                                                                                                                OF
                     R


                                                            DE
                                                               EP    SE
                                                           DE
                                                              SO           CU
                                                          EN LC               D   E
                                                             A      DA    R
                                                         EK L          OR
                                                           IB
                                                                 ER EHT
                                                                   AH
                                                                      S




                                                                                                                                                                                                          DRIVE SAFELY

                                                                                                                                                                                                                         WORK
                                                                                                                                                                                                                         ROAD
                                                                                                                                                                                                                          END
                                                                               CLO PATH
                                                            PE



                                                                               FOO
                                                              DE

                                                                                  SED
                                                                                   T
                                                                STR




      TEMPORARY




                                                                                                                                                                                                                         50
                                                                   OOT F
                                                                   IAN




         RAMP
                                                                       OTH E




                                               DESOL
                                                                       PAT
                                                                       S




                                              HTAPT C
                                                                          US
                                                                          ER
                                                                           H




                                                   OOF



                                                                                                                                                                                                                                HEADLAND DR
                                                                                                                                                                                           30m
                                                                                                                                                         FOOTPATH
                                                                                                                                                          OTHER
                                                                                                                                                           USE




                        YL
                                                                                                                                                                      PEDESTRIANS




                           EF                                                                RESIDENTS TO BE INFORMED OF WORKS
                    06 AS EVIRD                                                            WITH ALTERNATE ACCESS TO BE NEGOTIATED
                                                                                                                                                           FOOTPATH
                                                                                                                                                            CLOSED




                             KR
                            DA OW
                              O
                            DN R
                              E




   TGS DETAILS: TGS# ­QLD­EUMU­TGS9                                                                CLIENT / TRAFFIC MANAGEMENT DETAILS                         SITE DETAILS                                                             TRAFFIC MANAGEMENT TIME FRAMES                             DESIGNER DETAILS
            REV DATE                DESCRIPTION                                                    CLIENT NAME:          QLDBUILT                              LOCATION:                         EUMUNDI NOOSA RD                      TGS IMPLEMENTATION DATE: TBA
REVISIONS




            00 19/02/24 PRODUCED FOR CONSTRUCTION                                                  PROJECT MANAGER:      DOMINIC TYACKE ­ 0410 332 167         PRIMARY ROAD AFFECTED:            EUMUNDI NOOSA RD                      PROJECT DURATION:        UP TO 14 MONTHS                             Kyle Halliday
                                                                                                                                                                                                                                                                                                   Dept. Transport & Main Roads
            01                                                                                     SITE CONTACT:         LANCE HOLLAND ­ 0432 028 810          AFFECTED ROAD 2:                  STARBOARD AVE                         DURATION OF THIS PHASE:  UP TO 3 DAYS                        Traffic Management Design
            02                                                                                     TRAFFIC CONTROL Co:   TBA                                   AFFECTED ROAD 3:                  HEADLAND DR                           HOURS OF OPERATION:      0700­1700                             Certification # OP1503
            03                                                                                     NOMINATED TC CONTACT: TBA                                   ORIGINAL POSTED SPEED:            60Km/H                                TERM OF WORKS            LONG TERM
                        TGS REVIEWED BY GUY HALLIDAY ­ TMD # OP259                                 TRAFFIC MANAGEMENT: STATIC WORKSITE ­ REGULATORY            WORKSITE SPEED LIMIT:             40Km/H
                        PRINT TO A3    NOT TO SCALE                                                CONTROL METHOD:       PEDESTRIAN DIVERSION                  ROAD TYPE:                        TWO WAY

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.