qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (17.3 MB): may take a few minutes to open.
www.invarion.com
N
TRAFFIC GUIDANCE SCHEME (TGS)
W TGS DIAGRAM #
E QLDBUILT EUMUNDI NOOSA RD NOOSAVILLE QLDEUMUTGS9
S RESIDENTIAL DEVELOPMENT FOOTPATH CONSTRUCTION PEDESTRIAN DIVERSION
LEGEND TGS NOTES
1). THIS ARRANGEMENT IS DEVELOPED IN ACCORDANCE WITH THE QGTTM AND AS1742.3
2) ALL SIGNS TO BE MOUNTED IN PROMINENT POSITIONS WITH CLEAR LINE OF SIGHT TO ONCOMING TRAFFIC.
= SIGNAGE PLACEMENT 3). SIGNS THAT ARE INAPPROPRIATE TO, OR CONFLICT WITH, THE WORKSITE SITUATION SHALL BE COVERED OR REMOVED.
4). SIGNAGE PRESENT FOR UP TO TWO WEEKS MAY BE ERECTED ON PORTABE LEGS 200mm ABOVE THE SHOULDER SURFACE TO THE BOTTOM EDGE OF THE SIGN.
= DEVELOPMENT AREA 5). WORKMAN (SYMBOLIC) SIGNS TO BE COVERED WHEN WORKERS HAVE LEFT THE AREA OR ARE NO LONGER VISIBLE TO TRAFFIC.
6). CLOSE DELINEATION SHOULD BE USED AT THE CORNER OF HEADLAND DR AND EUMUNDI NOOSA RD TO PROVIDE SEPERATION FOR PEDESTRIANS.
= EXISTING FOOTPATH 7). TEMPORARY LIGHTING SHOULD BE USED THROUGH THE DEVELOPMENT SITE AFTER HOURS TO PROVIDE ADEQUATE LIGHTING FOR PEDESTRIANS.
DEEPS ECUDER 8). FOR ADDITIONAL NOTES & GUIDANCE PLEASE REFER TO THE TGS COVER SHEETS SUPPLIED WITH THIS DIAGRAM.
DAEHA
= WORK AREA KROW
DAOR
= 700mm CONES / BOLLARDS
= PEDESTRIAN DIVERSION
= TEMPORARY HAZARD MARKER
= PEDESTRIAN BARRIER MESH
45m
= INTERNAL LANE WAY
= STABLE TEMPORARY SURFACE
RD
= CONCRETE AGITATOR
SA
OO
DE
EP
04 S ECUDER
IN
ND
MU
STARBOARD AVE
EU
45m
SN
AIR
TS
ED
EP
DA
D EH
TA 15m HT ESOL A
AP C
PE TO
OF
R
DE
EP SE
DE
SO CU
EN LC D E
A DA R
EK L OR
IB
ER EHT
AH
S
DRIVE SAFELY
WORK
ROAD
END
CLO PATH
PE
FOO
DE
SED
T
STR
TEMPORARY
50
OOT F
IAN
RAMP
OTH E
DESOL
PAT
S
HTAPT C
US
ER
H
OOF
HEADLAND DR
30m
FOOTPATH
OTHER
USE
YL
PEDESTRIANS
EF RESIDENTS TO BE INFORMED OF WORKS
06 AS EVIRD WITH ALTERNATE ACCESS TO BE NEGOTIATED
FOOTPATH
CLOSED
KR
DA OW
O
DN R
E
TGS DETAILS: TGS# QLDEUMUTGS9 CLIENT / TRAFFIC MANAGEMENT DETAILS SITE DETAILS TRAFFIC MANAGEMENT TIME FRAMES DESIGNER DETAILS
REV DATE DESCRIPTION CLIENT NAME: QLDBUILT LOCATION: EUMUNDI NOOSA RD TGS IMPLEMENTATION DATE: TBA
REVISIONS
00 19/02/24 PRODUCED FOR CONSTRUCTION PROJECT MANAGER: DOMINIC TYACKE 0410 332 167 PRIMARY ROAD AFFECTED: EUMUNDI NOOSA RD PROJECT DURATION: UP TO 14 MONTHS Kyle Halliday
Dept. Transport & Main Roads
01 SITE CONTACT: LANCE HOLLAND 0432 028 810 AFFECTED ROAD 2: STARBOARD AVE DURATION OF THIS PHASE: UP TO 3 DAYS Traffic Management Design
02 TRAFFIC CONTROL Co: TBA AFFECTED ROAD 3: HEADLAND DR HOURS OF OPERATION: 07001700 Certification # OP1503
03 NOMINATED TC CONTACT: TBA ORIGINAL POSTED SPEED: 60Km/H TERM OF WORKS LONG TERM
TGS REVIEWED BY GUY HALLIDAY TMD # OP259 TRAFFIC MANAGEMENT: STATIC WORKSITE REGULATORY WORKSITE SPEED LIMIT: 40Km/H
PRINT TO A3 NOT TO SCALE CONTROL METHOD: PEDESTRIAN DIVERSION ROAD TYPE: TWO WAY
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.