Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                              DESIGN RISK CONSIDERATIONS
                                                                         Site Specific Hazards
             Site Hazard                                      Associated Risk                                           Proposed Treatment
o   Works occupying footpath              o   Potential for pedestrians to come into contact with    o   Pedestrians diverted onto the road under the protection
                                              hazardous site conditions or plant                         of barriers.

o   Heavy vehicles entering and leaving   o   Potential for rear end collisions with the public      o   Truck warning signs
    site
o   Site plant required to reverse into   o   Potential for collisions with public vehicles and      o   Hold & release traffic control to allow vehicles to reverse
    site                                      pedestrians                                                into site.
                                          o   Cause large disruption to Eumundi Noosa Rd
o   Pedestrians being diverted through    o   Potential for incidents within the worksite due to     o   Flood lighting to be installed after hours to provide a well
    site off existing footpaths               pedestrians                                                lit area for pedestrian movements.
                                          o   Potential for pedestrians to be accosted or followed   o   All hazards to be fenced off during this phase to isolate
                                              through worksite after hours                               pedestrians from potential risks within the development
                                                                                                         area.




                                                                                                                                                                        5

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.