Skip to the record
The gold standard in government transparency.

Council archive · source document

qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
Potential Safety Hazards        Applicable TGS     Risk rating                                                Control Measures                                           Risk rating
                                                 before controls                                                                                                        after controls
To CONSTRUCTION /
   WORKSITE /                                    L     C     R#    Eliminate / Substitute             Engineer / Isolate                    Administrative              L     C    R#
   CONTRACTOR
   VEHICLES
Reduced visibility (night                                          ☐ Work during times      ☐ Lighting towers                    ☐ Reflective signage
work)                                                                of better visibility   ☐ Portable traffic signals           ☐ Reflective cones / bollards
☐ Present     ☒ Not Present                                          (day time)             ☐ Other                              ☐ Other
                                                                   ☐ Other
No access to site due to                                           ☐ Work during times      ☐ Lighting towers                    ☐ Reflective signage
delineation, barriers, gates                                         of better visibility   ☐ Portable traffic signals           ☐ Reflective cones / bollards
☐ Present     ☒ Not Present                                          (day time)             ☐ Other                              ☐ Other
                                                                   ☐ Other
Construction / worksite              5,6         L3    C3    R3    ☐ Alternative egress                                                                                 L3   C5    R4
                                                                                            ☒ Traffic Controller/s               ☒ Communication compulsory
traffic reversing into or out                                        point
                                                                                            ☐ Portable Traffic signals
of site                                                            ☐ Other

☒ Present     ☐ Not Present

Worksite vehicles entering                                         ☐ Exclusion zone
                                                                                            ☐ Traffic Controller/s               ☐ Communication compulsory
live traffic lanes to either                                       ☐ Lane closure
                                                                                            ☐ Portable Traffic signals
move locations or perform
their task
☐ Present     ☒ Not Present
                                                                   ☐ Other
Works vehicles                      1,5,6,7      L3    C3    R3                             ☐ Safety Barriers                    ☒ Speed reduction                      L4   C4    R4
entering/leaving the                                                                        ☐ Turn lane Closure                  ☒ Warning signs / VMS
worksite                                                                                    ☒ Traffic Controller/s               ☐ Delineation/control of access
☒ Present     ☐ Not Present                                                                 ☐ Acceleration / deceleration         points
                                                                                              lane                               ☐ Traffic controllers to communicate
                                                                                            ☐ Other




                                                                                                                                                                                         11

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.