Council archive · source document
qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (17.3 MB): may take a few minutes to open.
Potential Safety Hazards Applicable TGS Risk rating Control Measures Risk rating
before controls after controls
To TRAFFIC L C R# Eliminate / Substitute Engineer / Isolate Administrative L C R#
CONTROLLERS
Poor escape route options ☐ Move control point ☐ 4 cones on centre line ☐ Speed reduction
☐ Present ☒ Not Present to a safe position ☐ Follow TCASAP and WHS
☐ Lane Closure standards
Uncontrolled ingress / ☐ Additional
☐ Ensure clear sight distance ☐ Pre-warn residents of works
egress points between personnel
between TC control points ☐ Pre-warn residents to travel with
traffic control points ☐ Side track
flow of released traffic
☐ Present ☒ Not Present ☐ Comms between work crew
and TC’s
☐ Other
Traffic controllers having to ☐ Adequate number ☐ Portable Traffic Control ☐ Follow TCASAP and WHS
control more than one of Traffic Controllers Device standards
direction of approaching
traffic
☐ Present ☒ Not Present
Unexpected high volume of ☐ Extra signs available if ☐ TMD contact details to be
traffic through the worksite required available to authorise / effect
causing long queues changes
☐ Present ☒ Not Present
10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.