Skip to the record
Beware of cheap imitations.

Council archive · source document

qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
FPE Ref: 6693-240215-1.0



      ▪    Site access and security.


  4.0 PROJECT/SITE INDUCTIONS
  All personal working onsite must undergo a site / contractor’s site induction to ensure that all personnel
  are aware of their responsibilities relating to environmental management of the site and requirements
  under this CEMP.


  5.0 RECORDS
  All site records must be kept up to date and be available for viewing as required. These include:

      ▪    Daily environmental checklist, including (but not limited to) assessment of:
               o     General waste / recycling areas, construction waste bins;
               o     Stockpiles and retention areas;
               o     ESC controls;
               o     Vegetation;
                                                           T
               o     Hazardous materials storage areas;
                                                 AF

               o     Plant and machinery; and
               o     Site exclusion fencing.
                                           R


      ▪    Induction records;
                                     D



      ▪    Incident forms - must be completed for all complaints, incidents, and non-conformances with this
           CEMP (refer
      ▪    Appendix A)

  All updates to this CEMP – should be reflected in the document review section of this CEMP, complete
  with version number and personnel.




15 February 2024                   Construction Environmental Management Plan                                  7
                           79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville
                                                       QLD

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.