Council archive · source document
qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094
Plans and drawings: the text below has words only, no drawings.
Very large file (17.3 MB): may take a few minutes to open.
FPE Ref: 6693-240215-1.0
6.0 ENVIRONMENTAL MANAGEMENT PLANS
The environmental subplans comprise the following elements:
▪ Objectives –What is to be achieved for each environmental aspect potentially impacted on by
construction activities;
▪ Potential Impacts – What environmental and ecological values may be affected due to
construction activities;
▪ Performance Criteria – Benchmark from which compliance can be measured, with criteria
derived from legislation, standards, guidelines or agreed criteria;
▪ Control Measures – Methods and procedures to be undertaken to achieve the aims of the
specified CEMP element;
▪ Monitoring and Reporting – Information that will be collected, by whom, and the format and
frequency that it will be reported; and
▪ Incidents and Corrective Action – Potential incidents and the remedial actions to be
implemented.
T
AF
R
D
15 February 2024 Construction Environmental Management Plan 8
79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville
QLD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.