6.1 SOIL & WATER QUALITY MANAGEMENT
Objective To manage the environmental impacts associated with earthworks, exposure of soils and site runoff.
Potential impacts Soil erosion and sediment transport may degrade down gradient water quality.
▪ Erosion and sediment control is to be implemented in accordance with the IECA Best Practice Erosion and Sediment Control (2008).
Performance
▪ Limited erosion and sedimentation down gradient occur during construction works to the extent that there is no worsening in down gradient
Criteria
water quality.
▪ Erosion and sediment control measures are to be implemented for the site in accordance with the IECA Best Practice Erosion and Sediment
Control Measures
T
Control Guideline (2008).
AF
▪ Install fencing to delineate construction zone and identify “no-go” exclusion areas where required.
▪ Appropriately integrate the development into the site whereby stripping ground, exposing areas, stockpiling and other activities which present
a soil and erosion risk are captured within an ESCP1 (refer Appendix C) .
R
▪ Integrate erosion and sediment control issues into construction planning.
▪
▪
▪
D
Develop effective and flexible erosion and sediment control plans based on anticipated soil, weather and construction conditions.
Minimise the extent and duration of soil disturbance. Cover disturbed areas (such as with heavy mulch) which are open without activity.
Control water movement through the site – establish a bypass for ‘clean’ water to minimise interaction with areas of soil disturbance.
▪ Minimise soil erosion.
1 ESCP completed by Future-Plus Environmental dated Feb 2024
15 February 2024 Construction Environmental Management Plan 9
79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
qldBUILT Construction Management Plan - JURA Rev02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 17.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.