qldBUILT Construction Management Plan - JURA Rev02 · MCU23/0094

of 81

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (17.3 MB): may take a few minutes to open.

Log in to see the plans as drawn
 FPE Ref: 6693-240215-1.0



          6.1      SOIL & WATER QUALITY MANAGEMENT

          Objective             To manage the environmental impacts associated with earthworks, exposure of soils and site runoff.

          Potential impacts     Soil erosion and sediment transport may degrade down gradient water quality.

                                ▪    Erosion and sediment control is to be implemented in accordance with the IECA Best Practice Erosion and Sediment Control (2008).
          Performance
                                ▪    Limited erosion and sedimentation down gradient occur during construction works to the extent that there is no worsening in down gradient
          Criteria
                                     water quality.
                                ▪    Erosion and sediment control measures are to be implemented for the site in accordance with the IECA Best Practice Erosion and Sediment
          Control Measures




                                                                                                   T
                                     Control Guideline (2008).




                                                                                         AF
                                ▪    Install fencing to delineate construction zone and identify “no-go” exclusion areas where required.
                                ▪    Appropriately integrate the development into the site whereby stripping ground, exposing areas, stockpiling and other activities which present
                                     a soil and erosion risk are captured within an ESCP1 (refer Appendix C) .




                                                                                   R
                                ▪    Integrate erosion and sediment control issues into construction planning.
                                ▪
                                ▪
                                ▪
                                                                             D
                                     Develop effective and flexible erosion and sediment control plans based on anticipated soil, weather and construction conditions.
                                     Minimise the extent and duration of soil disturbance. Cover disturbed areas (such as with heavy mulch) which are open without activity.
                                     Control water movement through the site – establish a bypass for ‘clean’ water to minimise interaction with areas of soil disturbance.
                                ▪    Minimise soil erosion.




         1 ESCP completed by Future-Plus Environmental dated Feb 2024




15 February 2024                                                Construction Environmental Management Plan                                                                            9
                                                      79 - 83 Eumundi Noosa Road & 26 Headland Drive, Noosaville QLD

Used in these records

About this file

File size
17.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

qldBUILT Construction Management Plan - JURA Rev02.pdf · 17.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.